7.2
Parameterizing/configuring
7.2.1
Commissioning
Note
Since the commissioning and parameterization of the speed monitor are important safety-
related steps, they must be carried out by qualified personnel.
Requirements
The following requirements must be met for commissioning:
• The device has been installed
For more information see: Chapter "Assembling (Page 37)"
• Check all the latches to ensure that they are properly engaged.
• The device has been wired
For more information see: Chapter "Connecting (Page 41)"
• The parameterization is available and consistent.
• The power supply for the device is connected.
7.2.2
Parameterization using the display
To enter the parameterization mode of the device, press the following button combinations:
• Press the right button and keep it pressed.
• Also press the left button (see below).
A display test follows
• After correct execution of the display test, confirm with the OK button (right button)
• The parameterization can then be modified.
• Before the device accepts the modified parameters, you must confirm the parameters again
for security.
Operation
7.2 Parameterizing/configuring
3TK2810-1 safety-related speed monitor
Equipment Manual, 05/2020, NEB926246402000/RS-AE/007
49