Commissioning
Please check the following requirements before commission:
!
The PV inverter is securely mounted on the wall
!
DC cables are connected with correct polarity and securely fixed on DC connectors
!
Correct connection of the AC cables
!
AC cover is well-fitted on the housing and the cable glands are tightened
Follow the steps below for commissioning:
1. Turn the DC switch to “ON” position to feed in the DC power.
Ⴃ
Figure 2.9-1 DC Switch
2. If is present an external DC switch, switch on the external DC switch to feed in the DC power.
3. As long as the DC voltage from PV string is greater than 150V
DC
, the LCD will be turned on.
4. At the first start-up, the user will be requested to set the language and regulatory setting according to
the local grid standard.
5. Language shall always be set prior to the regulatory setting. At “Set Language” screen, press
႒
to
enter the language menu.
6. Press
!
or
"
to select the desired language.
7. Press
႒
for 5 seconds to confirm the language setting and go to regulatory setting screen.
8. At “INITIALIZATION” screen, press
႒
to enter the regulatory setting menu.
9. Press
!
or
"
to select the desired grid standard.
10. Press
႒
for 5 seconds to confirm the regulatory setting. The initialization is completed if “INIT OK”