INSTALLATION
5.7
Storage information
SICK devices and spare parts must be stored in a dry place with sufficient ventilation. Paint
fumes, silicone sprays etc. must be avoided in the storage environment.
5.8
Scope of delivery
Check the scope of delivery according to the order confirmation/delivery note.
Checking the delivery state
Check all components have no exterior damage.
Make sure the supply voltages indicated on the type plates correspond to the system
conditions.
5.9
Installation
Installation steps overview
DANGER: Health hazard due to contaminated probe
Depending on the composition of the gas in the measuring channel, the measuring
probe, after use in the process, may be contaminated with substances that can cause
serious damage to health.
▸
Decontaminate the measuring probe before storage.
▸
Wear protective clothing in accordance with regulations when working with a
contaminated measuring probe.
▸
Clean all components of the measuring system with slightly moistened cleaning
cloths. Use a mild cleaning agent here.
▸
Pack all components for storage or transport. Preferably use the original packing.
▸
Store all components of the measuring system in a dry, clean room.
Storage temperature for all components -40 °C to +80 °C.
Step
Procedure
Reference
1
Fit the counterflange on the duct.
see “Fitting the counterflange on the
duct”, page 25
2
Fit the control unit.
see “If necessary, attach duct insula-
tion to protect the device from heat.”,
page 25
3
Install the control unit.
see “Installing the control unit”,
page 25
4
Install the probe.
see “Installing the probe”, page 26
5
Install the measuring probe.
see “Installing the measuring probe”,
page 27
6
Fit the counterflange.
see “Fitting the counterflange”,
page 28
7
Align the V-shield.
see “Aligning the V-shield”, page 29
8
Lay the probe cables and hoses.
see “Laying the probe cable and
hoses”, page 29
9
Install the probe cable.