![SICK TRANSIC111LP Operating Instructions Manual Download Page 22](http://html1.mh-extra.com/html/sick/transic111lp/transic111lp_operating-instructions-manual_1264716022.webp)
22
8014084/ZWT7/V3-1/2020-06 | SICK
O P E R A T I N G I N S T R U C T I O N S | TRANSIC111LP
Subject to change without notice
3
INSTALLATION
3.3.3
TRANSIC111LP installation - extractive
Filter recommendation
●
Stainless steel filter: Minimum protection against dirt particles
●
PTFE filter: For gas with humidity and/or fine dirt particles
Fig. 7: TRANSIC111LP with sample gas cell
Installing the wall bracket
1
Fasten the wall bracket.
Wall bracket dimensions,
see “ TRANSIC111LP with wall bracket and sample gas cell”,
.
2
Fasten the TRANSIC111LP
1
Install the TRANSIC111LP on the wall bracket using the four M6 screws provided.
2
First fix both outer screws in the threads at the bottom of the TRANSIC111LP. This
simplifies fastening the two inner screws when positioning the TRANSIC111LP on the
wall bracket.
3
Tighten all four screws.
CAUTION:
Risk of burns through hot gas
▸
Attach the enclosed warning label to the sample gas cell surface when process
temperatures are >65 °C.
NOTICE:
Preparing the gas sample for dirty and wet gas
▸
Filter and dry the gas sample before pumping it into the sample gas cell.
▸
Use a hydrophobic dust filter before the inlet opening of the sample gas cell to
protect the optical components against particle and water.
▸
Replace the dust filter regularly to ensure sufficient throughflow.
▸
Dry the gas through cooling and reheating to guard against condensation in the
sample gas cell.
2
3
4
1
1 = Optionally available assembly bracket
2 = Swagelok connections for Ø 6 mm gas tubes (in scope of delivery: Adapter for 1
⁄
4")
3 = Max. screw size M6
4 = Wall bracket