7
AOD1 evaluation unit (e.g., AOD1-MR27D4, part number: 6070574)
8
Computer
9
PLC
ß
Switch
NOTICE
When the device is connected to the AOD1 evaluation unit, seal off the unused connec‐
tion
2
of the Y-distribution (Ethernet interface) using the enclosed protective cap. This
is necessary to maintain the specified IP67 enclosure rating of the device, including
connection cables and Y-distribution, during operation.
5.2
Mounting instructions
•
Observe the technical data.
•
Protect the sensor from direct sunlight.
•
To prevent condensation, avoid exposing the device to rapid changes in tempera‐
ture.
•
The mounting site has to be designed for the weight of the device.
•
To avoid inaccurate measurements when installing multiple devices: Make sure
that the laser light spot of one device is not in the visible range of another device.
•
Take into account the device warm-up time of 10 minutes. During the device
warm-up phase, the measured values are subject to an increased variance (tem‐
perature drift).
5.3
Mounting device
1.
Mount the device using the designated fixing holes,
.
2.
Make the electrical connection. Attach and tighten a voltage-free cable,
necting the device electrically", page 30
3.
Switch on the supply voltage.
✓
The status LED lights up green.
The device needs around 10 seconds of initialization time before it is ready for
operation.
4.
Align the light spot so that the desired object is measured.
Mounting on the wall
2x
Figure 18: Mounting on the wall
MOUNTING
5
8021391/17Y6/2020-05-11 | SICK
O P E R A T I N G I N S T R U C T I O N S | OD5000
23
Subject to change without notice