O P E R A T I N G I N S T R U C T I O N S | DUSTHUNTER SB30
Subject to change without notice
3
ASSEMBLY AND INSTALLATION
3.2
Assembly
Carry out all assembly work onsite. This includes:
▸
Fitting the flange with tube
▸
Fitting the MCU control unit,
▸
Fitting the optional external purge air unit.
3.2.1
Fitting the flange with tube
Fig. 9: Fitting the flange with tube
WARNING:
▸
Observe the relevant safety regulations as well as the safety notices during
all work:
see “Important information”, page 6
▸
Consider the equipment weight specifications when planning the mounting
brackets.
▸
Only carry out assembly work on equipment with hazard potential (hot or
aggressive gases, higher internal duct pressure) when the equipment is at a
standstill.
▸
Take suitable protection measures against possible local hazards or
hazards arising from the equipment.
All dimensions specified in this Section are shown in mm.
TOP
A
A
A
A
> 30
Approx.
1
°
Ø 195
Assembly on steel duct
Marking for assembly position
Assembly on brick stack
Assembly on thin-walled duct
Junction plate
Duct wall
Anchor plate
Flange with tube
NOTE:
Maximum wall and isolation thickness are derived from the flange tube length
(350 mm or 700 mm) less the distance between flange and stack outer wall,
and stack immersion depth (> 30 mm).