OPERATING INSTRUCTIONS | DOSIC
®
8020955 /11HD/ 2018-12-12 | SICK AG
Subject to change without notice
20
7
COMMISSIONING
7
Commissioning
7.1
Quick commissioning (with factory settings)
Quick commissioning is used in applications under reference conditions see
.
Commissioning
1. Install the sensor in line with the installation conditions in
During the
DOSIC
®
installation process, the pipe system must be empty.
2. Switch on the supply voltage.
The sensor performs a self-test and is then ready for operation. The display shows
the current measured value.
In the event of problems during commissioning, see
.
7.2
Operation
7.2.1
Display and operating buttons
The display automatically alternates between various states, which can be pre-config
-
ured using the menu.
You can access the menu by pressing the Set pushbutton for at least 2 seconds.
Set display A and display B
1.
Make your selection in the Config menu and confirm using Set.
2.
Select Disp A or Disp B and confirm using Set.
3.
Select the display value and confirm using Set.
7.2.2
Display and operating elements
57.00
L/min
Arrow pushbuttons: For navigating in the menu and changing values
Set pushbutton: For saving and confirming values and selecting the sub-menu
Esc pushbutton: For exiting the operating menu one step at a time
7.2.3
IO-Link
For operation via IO-Link, an IODD file, function blocks of common PLCs and a descrip
-
tion of the available telegram parameters can be downloaded from
.
IO-Link is available only if Q1 is defined as output and under Q1Type is defined as PNP
or Push-Pull.