Installation and configuration
Page 36
●
A 12VDC supply should be able to provide a peak current of 4.0A
and be fused at 6.3A.
●
A 24VDC supply should be able to provide a peak current of 3.0A
and should be fused at 5.0A.
3.5 Grounding the AIS transceiver
An M4 grounding screw and ring crimp are provided in the fixing kit to allow
connection to the grounding point on the rear of the AIS transceiver chassis as
indicated in Figure 17.
Figure 17 Grounding the AIS transceiver
This product must be connected to protective ground via the
ground connection point. It is essential that the ground
connection point is used in all installations, regardless of what
other equipment is connected. The ground connection point
must be bonded to protective ground using as short a
connection as possible.
Ground screw
and ring crimp
!
Summary of Contents for SAS-600
Page 1: ...SAS 600 AIS Class B SO transceiver Installation and operation manual...
Page 3: ......
Page 17: ...Notices Page 14...
Page 19: ...Introduction Page 16...
Page 25: ...Installation and configuration Page 22 Figure 5 Desk mounting the AIS transceiver...
Page 69: ...Technical information Page 66...
Page 77: ...Technical specification Page 74...
Page 78: ...201 0856 1...