PLE-30-080 Chainhoist Contoller
V1
Highlite International B.V. – Vestastraat 2 – 6468 EX – Kerkrade – the Netherlands
Ordercode: 70281
MANUAL
ENGLISH
Page 1: ...PLE 30 080 Chainhoist Contoller V1 Highlite International B V Vestastraat 2 6468 EX Kerkrade the Netherlands Ordercode 70281 MANUAL ENGLISH...
Page 2: ...ce 6 Features 6 Frontside 6 Backside 7 Functional Description 8 Do s and Don ts 9 Installation 10 Set Up and Operation 10 Forward Rotation Up 10 Backwards Rotation Down 10 Idle Position 0 10 Emergency...
Page 3: ...on Should there be any consult your dealer and do not use the device To maintain perfect condition and to ensure a safe operation it is absolutely necessary for the user to follow the safety instructi...
Page 4: ...ing Only handle the power cord by the plug Never pull out the plug by tugging the power cord Make sure that the device is not exposed to extreme heat moisture or dust Make sure that the available volt...
Page 5: ...vice is operated in any other way than the one described in this manual the product may suffer damages and the warranty becomes void Any other operation may lead to dangers like short circuit burns el...
Page 6: ...ne number 04 A brief description of the symptoms Claims The client has the obligation to check the delivered goods immediately upon delivery for any short comings and or visible defects or perform thi...
Page 7: ...and 10 Power Connector CEE 5 pole 32A Output Connector CEE 4 pole 16A 2x 16 pole multi connector HARTING Safety Emergency button Compact strong metal housing Mains Circuit Breaker 4x 16A D Circuit bre...
Page 8: ...onnector Setup Possibilities PLE 30 080 70281 1 4x red CEE for Motor 1 4 2 1x Harting for Motor 1 4 3 1x Harting for Motor 5 8 4 2x Harting for Motor 1 4 Motor 5 8 When the Chainhoist controller is NO...
Page 9: ...er on or in the vicinity of the load Make sure all people have left the operating area before you start to move any load 12 Make sure you have an unobstructed view on the entire travel path of the loa...
Page 10: ...does not seem to function properly Before operating the chainhoist controller make sure that your working area is free from obstacles and people and switch your working lights on People are never allo...
Page 11: ...ch off the RCD An RCD has to be tested on daily basis 02 Switch off all circuit breakers 03 Switch on the RCD 04 Switch on all circuit breakers in sequence The Forward Backward Rotation and Idle modes...
Page 12: ...connections with a damp cloth Make sure connections are thoroughly dry before linking equipment or supplying electric power The operator has to make sure that safety relating and machine technical in...
Page 13: ...ton clockwise to release Too much resistance on one of the connectors Measure the resistance Ohm of the connectors Controller does not respond Solution Please check the powercable and the connections...
Page 14: ...13 Ordercode 70281 Chainhoist Contoller Exploded View...
Page 15: ...necting terminal block 8 ILME socket female 9 Power outlet CEE socket 4 pin female 10 Chassis Base case 11 Rubber case feet 12 MCB 2 pole 13 Push knob for emergency stop red 14 Indicator green 15 Push...
Page 16: ...15 Ordercode 70281 Chainhoist Contoller Connection Diagram...
Page 17: ...3 Kg Operation Power Connector CEE 5 pole 32A Output Connector 4x CEE 4 pole 16A 2x 16 pole multi connector HARTING Safety Emergency button Housing Compact strong metal housing Mains Circuit Breaker 4...
Page 18: ...17 Ordercode 70281 Chainhoist Contoller Dimensions...
Page 19: ...18 Ordercode 70281 Chainhoist Contoller...
Page 20: ...2015 Showtec...