g. When you have set the transformer, use a sharp point to scribe the shaft of
each control rod where it leaves the flange collar. Record the settings of the
control rods and file this information with this manual for future reference.
h. Tighten the hose clamps. If the clamps are left loose, vibration may change
the adjustments.
Before beginning
checkout:
Before beginning checkout of the antenna system, be sure the following items
have been done:
• The antenna system has been installed in accordance with this
manual and the installation drawing.
• All radiators are operating and VSWR is within specification.
• The initial characterization data have been recorded.
• The system is gas-tight, purged, and pressurized.
Check out.
Check the system out as follows:
a. Bring up RF power slowly and observe transmitter readings, stability, and
general operation.
b. Run at about half power for at least an hour, reading forward and reflected
power, stability, etc.
c. If the system is stable and seems to be operating properly, bring it up to full
power. Take initial readings, and repeat the readings periodically.
Performance readings should not change, and there should be no evidence of
abnormal heating in the antenna system.
If any problem is found, fix it now. Call Shively Labs if you need help or
advice.
Operate.
Once the antenna has been installed and VSWR has been optimized, simply
apply the transmitter signal. Don’t exceed the rated power of the antenna.
Summary of Contents for 6842
Page 4: ......
Page 8: ......
Page 11: ...3 Preparation Figure 1 Tower layout single bay antenna ...
Page 12: ...Preparation 4 Figure 2 Tower layout two bay antenna ...
Page 13: ...5 Preparation Figure 3 Tower layout three bay antenna ...
Page 14: ...Preparation 6 Figure 4 Tower layout four bay antenna ...
Page 15: ...7 Preparation Figure 5 Tower layout five bay antenna ...
Page 16: ...Preparation 8 Figure 6 Tower layout six bay antenna ...
Page 17: ...9 Preparation Figure 7 Tower layout eight bay antenna ...
Page 18: ...Preparation 10 Figure 8 Top mounted installation ...
Page 22: ......
Page 26: ......
Page 32: ......
Page 37: ...29 Connecting the Antenna 2 bay Figure 17 Two way power divider mounted and connected ...
Page 38: ......
Page 46: ...Startup 38 Figure 21 Apply the signal ...
Page 48: ......
Page 51: ...43 Parts Figure 23 Endseal radome components ...
Page 58: ......
Page 60: ...52 Figure A 1 22 Feed Strap with Endseal Radome Deicer ...
Page 61: ...53 Figure A 2 6842 Exploded View with Endseal Radome ...
Page 62: ...54 Figure A 3 Bay Arm Stickers ...
Page 63: ...55 Figure A 4 Power Divider Mount Detail ...
Page 64: ......