Shire Abri Apex Assembly Download Page 3

G

Fit Roof Panels

1 On one short edge of each OSB

roof section 'H' attach one piece of
framework 'H2'.  This should be
flush with all outer edges.  Nail in
position using 4x 40 mm nails per
piece.  Repeat.

3 Lay down the door frame ‘D1’ as

you would view it on the building.

4 Lay the Door ‘D’ into the Door

frame. Check the door is square
and even in the frame. Secure
using 3 x 25mm screws in each
hinge using round holes only.

F

Fit Roof Bearers

1 Take 4 roof bearers 34x34x

2070 mm 'G'. 

2 Place in opposite guide holes of

both gables.

3 Drill and screw bearer to gable

using 1x 60 mm screw.
IMPORTANT ENSURE GABLE IS
AT 90'.  Repeat for all roof bearers.

4 Drill/screw roof bearers at ridge

together using 4x 60 mm screws.

1 Place the door on a flat level

surface outside door edge up.
Check which side of the door the
hinges are to be fitted.  The
diagonal door bracing should point
to the door opening.  The hinges
are to be fitted on to the boarding
which covers each horizontal door
bracing.

2 Fit hinge to door 'D'.  The long

pointed part should be placed on
the door and the end of this part
should finish at the end of the door.
The round moveable part will be
overhanging the edge of the door.
Fit in place using 4x 25 mm screws
per hinge.

D

Door Assembly

C

Wall Assembly

E

Gable Assembly

1 Place one side panel 'B' on the floor

at the right hand corner.  Place a
further panel 'B' inside the panel
already in place. THE PANELS
ALONG THE BACK WALL SHOULD
EXTEND FROM FLOOR EDGE TO
FLOOR EDGE.  The panels to go at
the side screw TO and fit INSIDE
the panels to go at the back.

2 Drill 2 holes, one to the top and one

to the bottom.  Do not drill into
adjacent panels.  Secure the panels
together using 2x 60 mm screws.

3 Place the window panel on the left-

hand side at the front. Drill/screw
through side panel into window
panel again using 3 x 60mm screws.

1 Place one gable section 'F' on top

of the back walls.  Drill 4 times
along the length and secure using
4x 60 mm screws.

2 Repeat at front.

6 Fit small door stop strips. Fit flush

to the inside edge of the sides of
the door. Nail in place using 12 x
40mm nails 6 for each piece.

7 Place the padbolt in position on the

outside of the right hand door 'D'
directly over the central horizontal
brace.  Ensure the edge is flush
with the upright edge.  Secure using
4x 25 mm screws using the round
holes only.

8 Place padbolt housing in position to

accommodate the padbolt. Secure
using 2x 25 mm screws using the
round holes only.

5 Place the completed door assembly

onto the building. Secure through
window and side panels using a
total of 6 x 60mm screws (3 in each
side).

Reviews: