
Assembly of Building -
PLEASE READ INSTRUCTIONS PRIOR TO ASSEMBLY
B
-
Fit Window Insert C1
(from top)
1 Place one hinge on the inner
rebate part of the top of the window.
The rounded part of the hinge
should sit above the outer edge of
the window. Screw the inner piece
into position using the pre drilled
holes in the hinge and 2x 25mm
screws. Repeat.
A
-
Floor Assembly
1 Take one floor panel 'A' and a piece
of framework 34x46x1980 mm
approx 'A1'. Place the framework
on the edge of the floor so that the
framework is flush and level with
the boarding and joists. Mark
where the floor joist meet the
framework and mark. Drill at these
marks. Secure to floor using 6x 60
mm screws.
4 Once all frameworks are fitted
between floor joists slide another
floor on top of the framework and
secure again using 3x 40 mm nails
per floor joist.
3 Place floors on your firm level base,
board side up. Take 5 pieces
framework 'A2', 34x46x345 'A2' and
place between each floor joist. Nail
half of the widest part to the floor
using 3x 40 mm nails per piece.
2 Repeat item 1 with one
more floor section.
2 Place the window into the aperture.
Secure the window to the panel
using 3x 25mm screws per hinge,
again through the predrilled holes in
the hinge. Repeat.
3 Open the window and fit a further 2x
25mm screws per hinge next to the
one already fitted in Step 1. Repeat.
5 Fit the Casement Stay on the
window using 2x 25mm screws.
6 Mark where the ‘pins’ will be placed.
7 Secure into position using
4x 25mm screws - 2 in each pin.
4
Fitting the Casement Stay.
Place
the casement stay centrally on the
inside of the window. Place the 2
pins under the casement stay.
Position so that it is not resting on
the framework of the panel and not
so high that the pins are of no use.