![Shimadzu IRAffinity-1 Instruction Manual Download Page 47](http://html1.mh-extra.com/html/shimadzu/iraffinity-1/iraffinity-1_instruction-manual_1256926047.webp)
3.3 Wiring the Cables
3-5
IRAffinity-1
1. Connect the connector of the USB interface of the PC to the connector on the interferometer unit through
the cable.
2. Connect the AC cable of standard accessory. The IRAffinity-1 operates whichever frequency of 50 Hz or
60 Hz is applied. Confirm that the dry indicator in front of the equipment lights up if the AC cable is
connected.
Refer to each instruction manual for the personal computer and the printer connection.
WARNING
ELECTRIC SHOCK
Power supply cable of this equipment is a 3 wire system containing the grounding wire. Insert it into 3 wire
system receptacle and ground is surely.
CAUTION
FLUCTUATION OF SUPPLY VOLTAGE AND CAPACITY OF POWER SUPPLY
Fluctuation of supply voltage and capacity of power supply for IRAffinity-1 is 100/120/220/230/240 V ± 10%,
150 VA, 50-60 Hz. Confirm the capacity of power supply, including the power for personal computer. If the
supply voltage is unstable or capacity of the power is insufficient, the equipment may not operate correctly. If
fluctuation of supply voltage exceeds ± 10%, use the separate stabilization power unit.
NOTE
The dry unit is built in the IRAffinity-1. This dry unit is driven to keep the humidity in the interferometer while
the equipment being stopped. Connect the AC cable even if the equipment is not used. Do not turn off the
power supply. The consumption power for dry unit is 4 VA.
NOTE
The control and calculation in the IRAffinity-1 is performed through the microcomputer. You cannot share the
power with the device which generates the spike noise with pulse shape.
3.3
Wiring the Cables
Summary of Contents for IRAffinity-1
Page 2: ...This page is intentionally left blank...
Page 14: ...xii IRAffinity 1 Symbol Definition Current AC Symbols Found on the IRAffinity 1...
Page 39: ...2 1 IRAffinity 1 Chapter 2 Specifications CONTENTS 2 1 IRAffinity 1 Specifications 2 2...
Page 60: ...Chapter 3 Installation 3 18 This page is intentionally left blank IRAffinity 1...
Page 131: ...3 IRAffinity 1 Z ZnSe 7 2 7 4...
Page 132: ...4 This page is intentionally left blank IRAffinity 1...
Page 134: ...This page is intentionally left blank IRPrestige 21...