![Shimadzu GC-2014 Instruction Manual Download Page 204](http://html1.mh-extra.com/html/shimadzu/gc-2014/gc-2014_instruction-manual_1256914204.webp)
14 Diagnosis
14.5
14
.
192
GC-2014
14.5
Standard Installation Test
After the system has been installed by your Shimadzu representative, the standard installation
test is performed to check whether the system is functioning properly.
14.5.1
Screen description
Select “5. STANDARD INSTALLATION” from the [DIAG] key screen to display the Standard
installation screen shown in Fig. 14.5.1.
The installation test can be performed at any time to check for proper functioning. From this
screen, load the analytical conditions of the standard installation test.
14.5.2
PF menu
Fig. 14.5.1
Standard installation test main screen
PF menu
Description
Reference
section
Load
Automatically sets the analytical conditions of the standard installation test.
When [Load] (PF menu) is pressed, “TEST” is displayed for the used file
name.
――
Unload
Returns analytical conditions to their former status.
――
Summary of Contents for GC-2014
Page 4: ...This page is intentionally left blank ...
Page 12: ...Contents viii GC 2014 This page is intentionally left blank ...
Page 28: ...1 Installation 1 3 Gas Supply Plumbing 16 GC 2014 This page is intentionally left blank ...
Page 78: ...5 Analysis 5 2 Notes for Analysis 66 GC 2014 This page is intentionally left blank ...
Page 90: ...6 Basic Key Operation 6 4 Getting Help 78 GC 2014 This page is intentionally left blank ...
Page 282: ...16 Special Functions 16 10 ROM Version No 270 GC 2014 This page is intentionally left blank ...
Page 318: ...306 GC 2014 This page is intentionally left blank ...