14 Diagnosis
14.3
14
.
188
GC-2014
14.3
Analysis Counter
Use the analysis counter to set the replacement timing of the septum, and the glass insert, when
the counter exeeds the limit, an error message is displayed.
14.3.1
Screen description
Select “3. ANALYSIS COUNTER” from the [DIAG] key main screen to display the screen
shown in Fig. 14.3.1.
When the dual INJ (DINJ) is used, the number of analyses is indicated as follows:
Dual mode: The value counted on the L (left) inlet is indicated when the signal polarity of the detector
(DFID, DTCD) is +. The value counted on the R (right) inlet is indicated when the signal polarity is -.
Single mode: The value counted on the selected inlet (L or R) is indicated.
(a) Dual INJ
(b) SPL
Fig. 14.3.1
Analysis counter screen
Computer for
Septum
Computer for
Insert
NOTE
Summary of Contents for GC-2014
Page 4: ...This page is intentionally left blank ...
Page 12: ...Contents viii GC 2014 This page is intentionally left blank ...
Page 28: ...1 Installation 1 3 Gas Supply Plumbing 16 GC 2014 This page is intentionally left blank ...
Page 78: ...5 Analysis 5 2 Notes for Analysis 66 GC 2014 This page is intentionally left blank ...
Page 90: ...6 Basic Key Operation 6 4 Getting Help 78 GC 2014 This page is intentionally left blank ...
Page 282: ...16 Special Functions 16 10 ROM Version No 270 GC 2014 This page is intentionally left blank ...
Page 318: ...306 GC 2014 This page is intentionally left blank ...