21V1-L
5 – 17
ADJUSTMENT
ITEM
ADJUSTMENT
POSITION
CONTROL
PRE-ADJUST
REQUIREMENT
CONTENT
INPUT
CONDITION
OUTPUT
ADJUSTMENT
PROCEDURE
27V
26 ± 1.1V DC
MODEL
21V1-L
AC 220V, RF INPUT
CONFIRMATION BY THE CRT
[VOLTAGE COMFIRMATION]
SET THE USER CONTROL TO SHIPMENT POSITION.
[VOLTAGE CONFIRMATION]
CHECK THE VOLTAGE OF C602 +VE TERMINAL AS SPECIFIED BELOW.
[OPERATION CONFIRMATION]
SUPPLY THE DC VOLTAGE TO C602 +VE TERMINAL AND MAKE SURE THE PROTECTOR IS
FUNCTIONED , HORIZONTAL OSCILATION STOP AND PICTURE DISAPPEAR.
[RECOVER INFORMATION]
PULL OUT THE AC CORD .
[CAUTION]
FROM THE RECOVER CONFIRMATION MENTIONED ABOVE,THE AC CODE MUST BE PULLED
OUT AT LEAST 4 SECOND BEFORE PLUGGING IN AGAIN. (IN ORDER TO MAKE SURE THE
㱘
-
COM HAS BEEN RESET.)
TP VOLTAGE
OPERATION VOLTAGE
䋭
AFTER ALL ADJUSTMENT FINISHED.
US 4 CH LION HEAD (MONOSCOPE PATTERN)
MODEL NAME
X-RAY PROTECTION OPERATING CONFIRMATION
䋭
STEP RANGE
䋭
21V1-L
Summary of Contents for 21V1-L
Page 32: ...21V1 L 7 1 TV 21V1 L Service Manual 21V1 L Market E CHAPTER 7 CHASSIS LAYOUT ...
Page 33: ...21V1 L 8 1 TV 21V1 L Service Manual 21V1 L Market E CHAPTER 8 BLOCK DIAGRAM ...
Page 34: ...21V1 L 8 2 ...
Page 35: ...21V1 L 8 3 ...
Page 37: ...21V1 L 10 1 TV 21V1 L Service Manual 21V1 L Market E CHAPTER 10 SCHEMATIC DIAGRAM ...
Page 38: ...21V1 L 10 2 ...
Page 39: ...21V1 L 10 3 ...
Page 41: ...21V1 L 11 2 3 0 1 81 7 KLS 3DUWV 6LGH ...
Page 42: ...21V1 L 11 3 3 57 81 7 LULQJ 6LGH ...
Page 43: ...21V1 L 11 4 3 57 81 7 KLS 3DUWV 6LGH ...
Page 57: ...21V1 L 14 ...