background image

FOR YOUR SAFETY
PLEASE READ THESE INSTRUCTIONS CAREFULLY
AND RETAIN THEM FOR FUTURE USE.

OWNER’S MANUAL

TJH1.5 LONG REACH
TROLLEY JACK

Summary of Contents for TJH1.5

Page 1: ...FOR YOUR SAFETY PLEASE READ THESE INSTRUCTIONS CAREFULLY AND RETAIN THEM FOR FUTURE USE OWNER S MANUAL TJH1 5 LONG REACH TROLLEY JACK...

Page 2: ...art Number TJH1 5 Product Weight 50kg Brand SGS Engineering Capacity 1 5 Ton A Closed Height 135mm D Fully Extended 855mm E Base Width 450mm F Base Length 1050mm H Height 180mm Saddle Diameter 105mm W...

Page 3: ...jack is for lifting only Never move a vehicle using the trolley jack as a dolly 7 Ensure the load is taken by the full saddle and that the point of lift on the vehicle is strong enough to support the...

Page 4: ...vehicle to be raised is chocked and standing on firm level ground before manoeuvring the trolley jack so that the saddle is directly underneath the lifting point Consult the vehicle manual to find ou...

Page 5: ...stands directly beneath suitable supporting points under the vehicle before gently twisting the handle anticlock wise 4 Carefully lower the vehicle onto the axle stands checking con stantly that the...

Page 6: ...em 3 Replace the filler plug then turn the handle clockwise and test the jack If efficiency is still low check the oil level as below CHECKING THE OIL LEVEL If the jack has been stored for long period...

Page 7: ...ease valve not tightly closed Release valve not seating Air in cylinder Check valve is closing fully Return to SGS Engi neering for repair Pump handle to purge air from system Trolley jack does not lo...

Page 8: ...Add lubrication to all moving parts as needed Every 6 months Carry out a thorough inspection for service ability of component parts Visually inspect for oil leaks only a slight oil seepage is permissi...

Page 9: ...y be required as proof of purchase You will invalidate your warranty if the product is found to have been misused tampered with modified overloaded or used for an application for which it was not desi...

Page 10: ...administra tion product development manufacturing and continual improvement Our registration verifies that SGS Engineering has adopt ed and maintains documentation for processes ranging from supplier...

Page 11: ...opean Communities Directive s and Standard s PLACE DATE Signature Robert Wyatt Company Secretary Derby UK 24th JUNE 2017 SGS Engineering UK Ltd SGS Engineering UK Ltd West Side Park Raynesway Derby DE...

Reviews: