
10
Project planning
MOVIMOT® advanced
Operating Instructions – MOVIMOT
®
advanced
219
10.3
MOVIMOT
®
advanced
MOVIMOT®
advanced
10.3.1
Project planning procedure
The following flow diagram illustrates the project planning procedure for a MOVIMOT
®
advanced drive unit consisting of gear unit, motor and inverter. This is a highly simpli-
fied illustration that serves to clarify the process. For example, the following points are
left out:
•
Reduction of the available nominal torque at low speeds
•
Capacity utilization of the field weakening range operation
•
Project planning of a mechanical braking
•
Checking non-cyclical special loads
•
Project planning of external braking resistors
•
Consideration of the mass moment of inertia ratio
•
Detailed calculation of permitted overhung loads
25891936/EN – 05/2020