Operating manual [27779165/EN] - EMS modular controls
20.5
Switching on sequence
Commissioning information
It is mandatory to adhere to the described switching on sequence.
In case of failures during commissioning, please refer to section “"Malfunctions" (
97).“
Switch the control system on:
•
Switch on the mains voltage, the control unit is ready for operation after about 1 s.
The control systems acts in accordance with the parameterized specifications
(signals at the digital inputs). The current operating status or a status message
are shown on the display.
A flashing display means a failure is active - see section “"Malfunctions" (