background image

SHANGHAI SERMATEC ENERGY TECHNOLOGY CO.,LTD

- 22 -

Attention

Do not install the equipment in the place that will affect the working

and living environment, because the normal operation of the

equipment will produce sound.

4.6 Installation method and space

The installation space of the energy storage cabinet shall ensure a

proper distance from the surrounding wall, so as to ensure that the

machine is convenient for opening and closing doors, plugging and

unplugging modules, normal heat dissipation and enough space for

the user to operate.

4.6.1 Installation space

The front and back sides of the energy storage cabinet shall not be

close to the wall. In order to ensure the normal operation of the

energy storage cabinet, the front and back sides of the energy storage

cabinet shall be kept at a reasonable distance. The distance between

the front cabinet door and the obstacles shall be kept above 1500mm

to ensure the necessary maintenance space, so that the cabinet can

open the door for maintenance and remove the battery module. The

distance between the front of the back cabinet door and the obstacles

shall be kept at least 1000mm, which not only ensures the necessary

maintenance door, but also ensures the cooling space of the back air

conditioner (as shown in Figure 4-2)

Fi

gure 4-2 Installation space of

energy storage device

Summary of Contents for SMT-100kWh

Page 1: ...SHANGHAI SERMATEC ENERGY TECHNOLOGY CO LTD 1 SHANGHAI SERMATEC ENERGY TECHNOLOGY CO LTD ...

Page 2: ...pearance 11 3 5 Components of the energy storage system 12 3 6 Technical parameters 13 3 7 Product appearance 15 4 Site preparation and installation 18 4 1 Objective 18 4 2 Transport 18 4 3 Carry 18 4 4 Open inspection 19 4 5 Installation environment 21 4 6 Installation method and space 22 4 7 Electrical connection 24 5 Equipment operation 28 5 1 Peak cutting and valley filling mode 28 5 2 Off gri...

Page 3: ...ECHNOLOGY CO LTD 2 8 2 System homepage 45 8 3 Commercial System Home Page 46 8 4 Electricity Analysis 46 8 5 Energy storage management 50 8 6 Report Forms 54 8 7 Warning 57 8 8 Personal Centre 58 8 9 Configuration Management 60 ...

Page 4: ...e 1 1 SMT 100kWh Nominal maximum system capacity 100kWh Power level 50kW 100kWh SMT 100kWh The maximum output power is 50kW compatible with 30kW The nominal capacity of the battery system is 100kWh 1 3 Applicable personnel This manual is intended for personnel who operate maintain and perform other tasks on energy storage products The reader needs some electrical knowledge and is familiar with the...

Page 5: ...angerous indicates a highly potentially dangerous situation that if not avoided could result in death or serious injury Warning Warning indicates a moderate potential hazard if not avoided could lead to death or serious injury Caution Caution indicates a low level potential hazard if not avoided could lead to a situation that could result in moderate or minor injury Notes Caution indicates a poten...

Page 6: ...body and contact may cause danger to the motor This mark indicates that the temperature is higher than the human acceptable range Do not touch it arbitrarily to avoid personal injury This symbol indicates that this is the protective earth PE terminal which needs to be firmly grounded to ensure the safety of the operator ...

Page 7: ...ay cause electric shock to death Do not touch the terminals or conductors connected to the grid circuit Pay attention to all instructions or safety instructions regarding connection to the power grid Danger Fatal high voltage inside the product Heed and observe the warning signs on the product Observe the safety precautions listed in this manual and other related documents of this equipment Danger...

Page 8: ... inspection and other operators can obtain it at any time 2 2 2 Staff requirements Only professional electricians or qualified personnel can perform various operations on this product The operator should be fully familiar with the composition and working principle of the entire energy storage system The operator should be fully familiar with the relevant standards of the country region where the p...

Page 9: ...5 Requirements for escape routes To ensure that staff can be evacuated quickly in the event of an accident please observe the following In the entire process of maintenance repair and other operations of the energy storage system it is necessary to ensure that the escape channel is completely unblocked It is strictly forbidden to pile up debris in the escape channel or occupy the escape channel in...

Page 10: ...out live measurement you should Do protective work such as wearing insulated gloves etc Must be accompanied to ensure personal safety 2 2 8 Precautions during maintenance or repair Warning After both the AC and DC sides of the energy storage system are disconnected be sure to wait 15 minutes before opening the rear door to perform maintenance or repairs on the power distribution part By performing...

Page 11: ...ntenance or repairs when the equipment is powered on When performing maintenance or repairs on the equipment at least two people must be on site until the equipment has been safely powered off and discharged before performing maintenance operations In addition the following protective or emergency measures should be taken according to site needs When carrying out various operations such as mainten...

Page 12: ...gy storage technology is of great strategic significance 3 1 2 Application of Energy Storage System Sermatec Energy provides high security high reliability industrial and commercial energy storage system solutions one stop integrated battery pack PCS control system fire protection system temperature control system monitoring system and coordinated the efficient work of various parts through the co...

Page 13: ...agement systems and cabinet dynamic ring temperature control systems The entire system is controlled and managed by the BMU battery management system and the BSC battery energy control system coordinating the work of various components such as LFP batteries PCS etc to achieve the energy absorption and release of the entire industrial and commercial energy storage system and provide a total solutio...

Page 14: ...vel safety chain structure design Full life cycle data black box function Automatic fire protection system High efficiency Ultra low power standby High safety LFP battery System cycle efficiency 88 under rated conditions Scalable All in one design supporting multiple machines in parallel Intelligent One key start unattended automatic operation Support and switch off grid operation Distributed micr...

Page 15: ... 3 5 Components of the energy storage system The main components of the energy storage system device cabinet are shown in the table below No Item QTY Unit Remarks 1 Cabinet 1 PCS Some power distribution devices have been configured in the cabinet ...

Page 16: ...ty meter 4 PCS 1 on the grid side 1 on the load side 1 on the micro source side and 1 on the energy storage circuit 6 Energy management system 1 SET 7 Air Conditioning System 1 SET AC grid connection parameters Rated output power kW 50 Wiring Three phase five wire Output overload capacity kW 55 Load capacity of inductive load kW 15 Allowable grid voltage Vac 400 15 15 Operating grid frequency HZ 5...

Page 17: ...rging power kW 50 Maximum discharge power kW 55 Rated discharge power kW 50 Maximum charging capacity kWh 115 Minimum configuration nominal energy kWh 100 Battery pack nominal voltage range Vdc 600 768 Battery pack nominal capacity range AH 150 200 Depth of discharge DOD 90 Cycles 5000 Cycle 100 charge and discharge damping to 80 Rated charge and discharge ratio 0 5C System parameter System cycle ...

Page 18: ...warehouse cooling method Forced air cooling Battery compartment cooling method Air conditioning refrigeration communication method Ethernet Operation method Peak cut Available standard Off grid function Available standard Parallel function Available standard Anti backflow function Available standard Reactive power regulation Available standard Demand control Available standard Grid Dispatching Int...

Page 19: ...ontrol Box Description The internal appearance of the energy storage is shown in Figure 3 4 The surface of the screen body mainly includes a touch screen normal indicators alarm indicators and emergency button Lo ca ti Description Location Description 1 Connect to battery positive 6 Running lights 2 Connect to PCS positive 7 Fault indicator 3 Connect to battery negative 8 Off grid switch 4 Connect...

Page 20: ...kWh energy storage device No description 1 Battery module 2 Electricity meter 3 Contactor 4 AC circuit breakers and lightning arresters 5 AC circuit breaker for energy storage circuit 6 AC side circuit breaker 7 Load side AC circuit breaker 8 Micro source side AC circuit breaker 9 Secondary terminal 10 External network interface ...

Page 21: ...rting and storing the cabinet The energy storage device is modular design which is convenient for the positioning and transportation of the equipment Each energy storage cabinet has been strictly inspected and tested before leaving the factory During transportation and handling great care must be taken to avoid damage to the control system and electrical components Before unpacking the energy stor...

Page 22: ...n receiving the energy storage cabinet check the appearance of all components for obvious damage Never receive damaged equipment from the carrier If possible move the equipment to the nearest place to its final installation location before unpacking All parts are packed before they are put into containers and shipped out If any damage is found during unpacking please report to the carrier immediat...

Page 23: ...d loose Whether the inverter cabinet is deformed paint is removed and loose If you find any of the above problems please contact Shanghai Sermatec Energy Technology Co Ltd in time and provide a report 4 4 2 Packing list See table 4 1 for the packing list of energy storage device cabinet NO Name Quantity Unit Remark 1 User s Manual 1 EA 2 Boundary dimension and foundation installation drawing 1 EA ...

Page 24: ...ayer of battery pack to ensure the temperature of the battery compartment from the top to the bottom is uniform Louvers are installed at the front and back of the electric bin of the energy storage cabinet and cooling fans are installed at the back to ensure the continuous cooling of the electric bin when necessary The specific way of heat dissipation is to let out the air after the forward wind T...

Page 25: ...e front and back sides of the energy storage cabinet shall not be close to the wall In order to ensure the normal operation of the energy storage cabinet the front and back sides of the energy storage cabinet shall be kept at a reasonable distance The distance between the front cabinet door and the obstacles shall be kept above 1500mm to ensure the necessary maintenance space so that the cabinet c...

Page 26: ...er fixed position by fine adjustment the front door of the cabinet is opened and the four corners of the cabinet are fixed by taking out M10 80 expansion screws as shown in Figure 4 3 Figure 4 3 Position Describe A N15OOmm Ensure that the front door of the cabinet can be fully opened enough cold air can enter and the user can easily plug and unplug the module and operate the circuit breaker B N1OO...

Page 27: ...ree phase three wire When the energy storage system is designed its output side can be connected to the low voltage grid through the isolation transformer The output of grid connection side is three phase five wire The output of load side is three phase five wire The output of micro source side is three phase five wire 4 7 3 Wiring method The whole system adopts the wiring mode of down in and down...

Page 28: ...le to measure to ensure that the phase sequence of the connected cable is positive Use a multimeter to measure and confirm that the cable connected to the terminal is no current The QF A B C N phase of the output distribution switch of the AC power grid is respectively connected to the A B C N phase of the power grid including the connection of PE line NO Phase sequence 1 A phase 2 B phase 3 C pha...

Page 29: ...t distribution switch 2qf A B C N phase is respectively connected to a B C N phase of the load including the connection of PE line Warning When wiring make sure that there is no dangerous voltage at the connection point Notes All wiring is connected to the terminal from the outside through the wire hole at the bottom of the energy storage device After wiring please seal the wire hole with fireproo...

Page 30: ...y wiring is correct the lower ground wire is well connected with the grounding grid and the construction unit is required to test the grounding resistance value Compare the factory main wiring diagram with the actual wiring on site to see if there is any difference and judge whether the difference will affect the safe operation of the energy storage system Notes All wiring is connected to the term...

Page 31: ...al does not have current C The output distribution switch QF A B C N phase of AC power grid is respectively connected to a B C N phase of power grid including the connection of PE line 2 All wiring is connected to the terminal from the outside through the wire hole at the bottom of the energy storage device After wiring please seal the wire hole with fireproof mud 3 When wiring make sure that ther...

Page 32: ...Table 5 4 off grid mode discharge description Matters needing attention Step four Wait for the system to start Note in case of any abnormality please disconnect all circuit breakers and press the 10 emergency stop button of the main control box Step 1 Step 2 Step 3 ...

Page 33: ...g is connected to the terminal from the outside through the wire hole at the bottom of the energy storage device After wiring please seal the wire hole with fireproof mud 3 When wiring make sure that there is no dangerous voltage at the connection point 4 Ensure that the communication harness and the DC side harness are connected correctly 5 Ensure that all switches circuit breakers and other type...

Page 34: ...QF grid connected circuit breaker is in off state 2 In case of any abnormality please disconnect all circuit breakers and press the 10 emergency stop button on the main control box Table 5 5 off grid mode charging instructions Step 5 Step 4 Step 1 Step 3 Step 2 ...

Page 35: ...n of PE line 2 All wiring is connected to the terminal from the outside through the wire hole at the bottom of the energy storage device After wiring please seal the wire hole with fireproof mud 3 When wiring make sure that there is no dangerous voltage at the connection point 4 Ensure that the communication harness and the DC side harness are connected correctly 5 Ensure that all switches circuit...

Page 36: ...SHANGHAI SERMATEC ENERGY TECHNOLOGY CO LTD 33 Note In case of any abnormality please disconnect all circuit breakers and press the 10 emergency stop button of the main control box Step 2 Step 1 Step 3 ...

Page 37: ...ch QF A B C N phase of AC power grid is respectively connected to a B C N phase of power grid including the connection of PE line 2 Make sure that the AC side wiring follows the load side wiring A Measure with the phase sequence table to ensure that the phase sequence of the connected cable is positive sequence B Measure with a multimeter and confirm that the cable connected to the terminal does n...

Page 38: ...ce device controller connected with communication line to main control box 5 All wiring is connected to the terminal from the outside through the wire hole at the bottom of the energy storage device After wiring please seal the wire hole with fireproof mud 6 When wiring make sure that there is no dangerous voltage at the connection point 7 Ensure that the communication harness and the DC side harn...

Page 39: ...NERGY TECHNOLOGY CO LTD 36 Step four Wait for the system to start Note In case of any abnormality please disconnect all circuit breakers and press the 10 emergency stop button of the main control box Step 2 Step 3 Step 1 ...

Page 40: ...ace it Loose contact 2 Contact the warranty department Load Overload Warning Load power 1 Check load to determine if it is greater than rated power or short circuit Overload or short out 2 Remove the load recovery Temperature anomaly alarm Inside the chassis 1 Check whether the ambient temperature exceeds the allowable value Overtemperature 2 Check whether the vent is blocked to lead to poor cooli...

Page 41: ...cuit connection is found 2 If not contact the warranty department Remote inaccessible No communication signal 1 Check external network The battery system is flooded Not working properly leakage in the system 1 Slight malfunction contact the warranty department 2 Change the installation site After system power supply the host machine does not work or restart continuously Power Supply is not supplie...

Page 42: ...e the temperature sensor Repair or replace wiring harness BMS voltage acquisition anomaly The voltage acquisition connection line is abnormal Slave board failure Repair and replace the voltage acquisition wiring harness Replace the Slave board Current acquisition anomaly Current sensor installed in reverse Current sensor fault Current sensor wiring harness is disconnected or short circuited Reinst...

Page 43: ... Matched resistance anomaly Replace the communication harness Reconfigure slave address Check the communication matching resistance When the energy storage system fails to work properly please refer to the instructions in the user manual If you still can not solve the problem please contact the distributor or manufacturer as soon as possible Do not remove the parts by yourself ...

Page 44: ...ethods to help the energy storage system in a good working state belong to the scope of maintenance work 7 1 Security considerations 7 1 1 General safety Warning Only qualified and authorized personnel can perform maintenance and other operations on the energy storage system During maintenance do not leave the screws washers and other conductors in the product otherwise the equipment may be damage...

Page 45: ...nnections For adjacent potentially live parts of the operating part using insulating fabric for insulating cover 7 2 Maintenance work and cycles Scope of examination Method of examination Maintenance period System running state and environment Listen for abnormal sound when the energy storage converter is running While the system is running check the variables Check whether the main device is norm...

Page 46: ...heck whether the insulation wrap of power cable terminal has come off The first time will be half a year after the first commissioning thereafter once every six months or once a year Terminal and line connection Check whether the control screw is loose and tighten it with a screwdriver Check whether the main loop terminal is poor contact and whether there are signs of overheating at the screw posi...

Page 47: ... mechanical checks on all components Annual inspection of contactor auxiliary switch and microswitch to ensure good mechanical operation Once every six months or once a year Safety function Check the stop function of the emergency stop button Simulate stop and check stop signal communication Once every six months or once a year ...

Page 48: ...onding user name and password and enter the error prompt error message 8 2 System homepage This page is the home page of the system the administrator login can see all the power station information Click on the corresponding power station to see the equipment in the power station below that is commercial system and residential system two types ...

Page 49: ...action current size flow direction and working status is a overview diagram 8 4 Electricity Analysis Electricity analysis options include operation monitoring terminal measurement revenue statistics revenue details electricity statistics and other options The running monitoring page reflects the monitoring data curves of the energy storage meter and the total meter and the options available are po...

Page 50: ...TD 47 Figure 1 Figure 2 Terminal metering page can find the system charge and discharge curve charge statistics and discharge statistics Users can choose nearly 1 week nearly January nearly March data display curve Figure 3 Figure 4 Figure 5 ...

Page 51: ...SHANGHAI SERMATEC ENERGY TECHNOLOGY CO LTD 48 Figure 3 Figure 4 ...

Page 52: ...e of the system cumulative charge and discharge of electricity and savings in electricity Can be queried by date Figure 6 Figure 6 The revenue details page shows in tabular form the system s peak time peak time normal time charging and discharging power and revenue and efficiency during the start and end dates Figure 7 ...

Page 53: ...fficiency to charge and discharge the sharp peak flat valley to compare Figure 8 Figure 8 8 5 Energy storage management Energy storage management options include energy storage monitoring battery overview battery rack information control strategy time time electricity prices and other options The energy storage monitoring page reflects some operation ...

Page 54: ...ew page has the monitoring curve of the device reflecting the battery voltage current SOC SOH etc as shown in Figure 10 Figure 11 The real time curves of the device reflect the maximum minimum voltage and the maximum minimum temperature of the cell rack on each group of cells Figure 10 Figure 11 Figure 12 Figure 10 ...

Page 55: ... CO LTD 52 Figure 11 Figure 12 Battery rack information page shows specific to each group of batteries each rack of batteries each battery temperature and voltage and other information can click on each item to query Figure 13 Figure 14 ...

Page 56: ...SHANGHAI SERMATEC ENERGY TECHNOLOGY CO LTD 53 Figure 13 Figure 14 The control policy page is mainly used to issue some commands Figure 15 ...

Page 57: ...the benefits Figure 16 Figure 16 8 6 Report Forms The statistical report options include battery pack SOC PCS power battery maximum pressure difference battery temperature difference and battery voltage difference The battery pack SOC page reflects the battery SOC information of the access system and here are six groups of representative systems ...

Page 58: ...ure 17 Figure 17 The PCS power page reflects the graph of the PCS power at different times of the day Figure 18 Figure 18 The maximum voltage difference page reflects the maximum voltage difference and the time of occurrence for each group of batteries in the system Figure 19 ...

Page 59: ... and the temperature difference per rack of batteries today and on the contrast date and the data can be exported to Excel tables Figure 20 Figure 20 The voltage differential curve of the battery reflects the maximum voltage the lowest voltage and the differential voltage per rack of batteries today and during the contrast date The data can also be ...

Page 60: ...nt is divided into activity warning and history warning An active warning can reflect in real time whether the system now has a warning message Historical warnings record all the warning information that has occurred in the system including the type level description and time of the warning Figure 22 Figure 23 Figure 22 ...

Page 61: ...e 23 8 8 Personal Centre Users in the personal center can see their own information and modify their own The personal center s user management is only open to administrators the average user cannot see this option Figure 24 Figure 25 Figure 26 Figure 24 ...

Page 62: ...SHANGHAI SERMATEC ENERGY TECHNOLOGY CO LTD 59 Figure 25 Figure 26 Administrators have permission to add and delete users Figure 27 Figure 28 ...

Page 63: ...management is divided into power station management and collector management Power station management page ordinary users can only see their own power station information administrator users can see all the power station information Only administrators have the ability to add power stations Figure 29 Figure 30 ...

Page 64: ... 29 Figure 30 Collector management page ordinary users can only see the collector information in their own power station administrator users can see all the collector information Only administrators have the ability to add a collector Figure 31 Figure 32 ...

Page 65: ...SHANGHAI SERMATEC ENERGY TECHNOLOGY CO LTD 62 Figure 31 Figure 32 ...

Page 66: ...omers with a full range of technical support users can contact a company office or customer service center or directly with the headquarters of the company All rights reserved The manual is subject to change without further notice Sermatec Energy Technology Co Ltd Website www sermatec com cn Address No 3939 North Jiasong Road Jiading Distinct shanghai China Tel 86 021 69986891 0 ...

Reviews: