
Data Pro
P/N 10029355 Rev AE
Operation Manual
Page 40 of 92
Figure 37 - Interface Setup for SPS
8.6.1
Restart Interface
Restart the gauge interface module via:
Menu
Interface Setup
Interface For Gauges
Restart Interface
During the restart of the SPS, the user can observe the following messages on the SPS LCD:
SPS Baud Rate
SPS Slave ID
SPS Firmware version
Sync Phases 1
– 16
Power Off in between to synchronize
Analyze Phases
Checking Tool
Programming Tool
Tool Response
Tool Configured!
Rcv Hdr 0
Rcv Hdr 1 (only available on U-Command ESP gauges)
8.6.2
Upload Firmware
This function allows the user to update the firmware of the internal SPS-1500 by loading a file
from the Data Pro front panel USB drive. Copy the firmware *.bin file to the root of a USB drive.
9
8
7
6
5
4
3
2
1
10