background image

Product description

:

Bulk meter for water up to 50 °C

Applications

MeiStream/MeiStream Plus/MeiStreamRF/MeiStreamRF Plus 50 °C / PN 16 or 40

- Measurement of cold potable water up to 50 °C          - Measurement of clean water up to 50 °C

Included in the delivery

1 Water meter; 2 Gaskets; 1 Manual

Technical data

Refer to the technical data sheets LB 1010, LB 1020, LB 1060 and LB 1080 (http://www.sensus.com)

Installation instructions
Safety tips

  

No mechanical stresses may be exerted on the meter when installed in the pipeline. The pipeline flanges must align 

with the meter flanges and the distance between the flanges must match the meter body length. Mis-alignment stresses 

can cause the meter body or flanges to crack. When the pipeline is under pressure this can cause flooding.
The meter must not be subjected to pressures higher than the pressure rating printed on the meter. Too high pressure 

can cause leaks or burst the meter body. 

General instructions

The meter must be installed by a trained and  instructed worker. Thereby the recognised 

standards of good practice have to be respected (We refer to the instructions given in ISO 4064-5:2014).
After the manufacturing process all meters are disinfected. The meters must be stored in a dry, cool, dust and germs 

free environment. Prior installation the meter must be disinfected again. Make sure that during the installation 

procedure all hygienic standards and recommendations are respected.

Installation Tools

Two spanners for the corresponding size
of bolts used are necessary. Hoisting devices may be required, depending on the weight of the meter and the 

installation conditions. 

Installation instructions

The meter with flow stabilizer does not need any straight upstream or downstream pipe (U0D0).
The maximum medium temperature shall not exceed 50 °C when in operation and 70 °C at down-time.
The environmental temperature must be within 5 and 70 °C.
The meters are classified acc. to 2014/32/EU (MID) in the mechanical environment class M2 (significant or high levels 

of vibration and shock) and in the electromagnetic environment class E2.
The  pipe diameter should not be abruptly reduced or expanded directly upstream or downstream the meter. All 

diameter changes should be done with an angle <8° related to the pipe centre.
All flow regulating devices (e.g. Valves, PRV’s) shall be installed downstream of the meter.
When selecting the  installation site, consider the meter orientation (horizontal/vertical)!
Gaskets must not protrude into the pipeline or be mis-aligned.
The pipeline must be thoroughly flushed before installing the meter to prevent damage from debris. 
The flow direction of the meter (arrow on the meter body) must correspond with the flow direction in the pipeline. 
After installation of the meter, the pipeline must be filled with water very slowly to prevent the meter being damaged 

by surges. Filling the pipe too rapidly can cause air / water surges which can destroy the meter insert.  
The installation site should be selected to prevent air bubbles collecting in the meter and the pipeline must always be 

completely filled with water. Installation of a meter at the highest point in a pipeline must be avoided. Eventually a 

suitable air release device must be installed upstream the meter.
The manufacturer’s Q

3

 value must not be exceeded for extended periods. 

The meter should be protected from stones, sand and fibrous material with a suitable strainer or filter.
The meter must be protected from pressure surges.
During operation always an upstream pressure of 0.3 bar must be ensured.
Exchanging the measuring insert

1.

2.

3.

5.1

5.1.1

5.1.2

5.2

5.2.1

5.2.2

5.3

5.4

5.4.1
5.4.2
5.4.3
5.4.4

5.4.5

5.4.6
5.4.7
5.4.8
5.4.9
5.4.10
5.4.11

5.4.12

5.4.13

5.4.14
5.4.15
5.4.16
5.4.17

Metrological units must be replaced by metrological units with an identical metrology marking. Metrological 

units with MID approval must be installed only in bodies with the marking “MID” on the upper flange surface.
Before the installation of a replacement measuring insert the inside surface of the body, especially the sealing areas of 

the O-ring must be checked for damage. A new O-ring must be used. Prior installation of the new metrological unit the 

meter body must be cleaned and disinfected.
The O-ring and the lip seal must be lubricated with grease approved for use with potable water before installation into 

the meter body. 
To avoid damaging the O-ring when installing a meter insert, the O-ring must first be fitted onto the cover flange and 

then pushed into the meter body. If the O-ring is fitted into the body first, it can be pinched when fitting the meter insert 

and cause leaks.
When installing the measuring insert into the meter body make  sure that the direction of the arrow  on the head flange 

aligns with the  arrow on the meter body.
The screws fixing the measuring insert in the body shall be screwed  hand tight and then tightened crosswise with an 

Allen key. The recommended torque is 40 Nm (M12) or 160 Nm (M16). Using the composite head flange the torque 

shall not exceed    20 Nm.
With meters used for billing at least one screw of the measuring insert shall be sealed against the meter body after the 

exchange to avoid tampering.

MB 9202

MeiStreamRF / MeiStreamRF Plus

MeiStream / MeiStreamPlus

with flow stabilizer (MID)

Installation Manual

EN DE FR ES

Reading

The black digits on the roller counter indicate whole cubic metres. Parts of a cubic metre are indicated by the red sweep 

hands. If there is a factor “x10” printed under the roller counter it requires the reading to be multiplied by 10 for a reading to 

the nearest 10 cubic meters. For a reading to the nearest cubic metre, the black sweep hand must be read. Please see display 

example below: The complete volume is 13,572m³.

6.

Mechanical register display
MeiStream / MeiStream Plus

Electronic register display 

MeiStreamRF / MeiStreamRF Plus

LCD Segments test 

(1 sec every minute)

Testing Mode

Forward Flow

Reverse Flow

Alarm Set

DN 40 ... 125

DN 150 ... 300

Flow Direction

LC Display

Forward Flow

+ with flashing circle

Reverse Flow

- with flashing circle

No Flow

N, nor - circle

Transmission icon

Flashing mode by activated radio (1 sec on/ 1 sec off)

Low  Battery Types

Description

Low Battery

Low battery alarm will be triggered 15 

months before the calculated end of life. 

(steady display – not blinking)

Very Low Battery 

Low battery alarm will be triggered 6 months 

before the calculated end of life (flashing 

display)

The “Bell” icon is flashing when the register is in a testing mode

When an alarm is triggered the alarm icon will be visible on the LCD

7. Orientation

Type

Register *)

Pipe *)

MeiStream
MeiStreamRF

Upwards or 90° 

slanted

      

Horizontal

Vertical

MeiStream Plus
MeiStreamRF Plus

Upwards

Horizontal

*) when used for billing the marking on the type plate must be followed

Cubic Meters

Litre

Imperial Gallons

US Gallons

Cubic Feet

Kilo Litre

8. Transport

Electronic register display MeiStreamRF / MeiStreamRF Plus

9. Maintenance and cleaning

Under normal conditions the meter is maintenance free. If required the measuring insert can be 

removed and cleaned (when used for billing national regulations must be followed). Chemicals, 

sharp objects or high-pressure cleaners must not be used for cleaning. Respect section 5.2.2 of this 

instruction.

10. Disposal

This product contains a lithium Ion battery. In the interest of protecting the environment, this
battery may not be disposed in household waste after its period of use. The local and national
regulations for environmental protection are to be considered.

MB 9202 INT4 / 08-2017 • 0016 │  www

.sensus.com   │  info.int

@xyleminc.com

1241

Lithium

Summary of Contents for MB 9202

Page 1: ...1 5 4 12 5 4 13 5 4 14 5 4 15 5 4 16 5 4 17 Metrological units must be replaced by metrological units with an identical metrology marking Metrological units with MID approval must be installed only in bodies with the marking MID on the upper flange surface Before the installation of a replacement measuring insert the inside surface of the body especially the sealing areas of the O ring must be che...

Page 2: ... 10 5 4 11 5 4 12 5 4 13 5 4 14 5 4 15 5 4 16 5 4 17 Messeinsätze dürfen nur durch Messeinsätze mit gleicher Metrologie Kennzeichnung ersetzt werden Messeinsätze mit MID Zulassung dürfen nur in Gehäuse mit der Kennzeichnung MID auf der Flanschoberseite eingebaut werden Vor dem Einbau eines neuen Messeinsatzes müssen die Dichtungssitze und das Innere des Gehäuses auf Beschädigungen und Verschmutzun...

Page 3: ...0 5 4 11 5 4 12 5 4 13 5 4 14 5 4 15 5 4 16 5 4 17 Le mécanisme de mesure doit être remplacé par un mécanisme de mesure identique avec marquage métrologique Le mécanisme de mesure ayant une approbation MID doit être installé uniquement dans un corps ayant un marquage MID Avant l installation d un mécanisme de mesure dans un nouveau corps la zone d étanchéité du joint torique doit être nettoyée Un ...

Page 4: ...16 5 4 17 Los conjuntos de inserción deben ser reemplazados por conjuntos de inserción con igual marcado metrológico Conjuntos de inserción con aprobación MID deben ser sólo instalados en cuerpos con marcado MID Antes de instalar un conjunto de inserción nuevo la superficie interior del cuerpo en especial las áreas de cierre de la junta tórica debe ser comprobada en busca de daños Una nueva junta ...

Reviews: