![SENSTAR Intelli-FLEX II Product Manual Download Page 52](http://html.mh-extra.com/html/senstar/intelli-flex-ii/intelli-flex-ii_product-manual_1244251052.webp)
Installation of cable at gates
5 - 16 • • • Intelli-FLEX II product guide
Installation at double panel swinging gate
•
For a double panel swinging gate install the sensor cable on each gate panel.
See “Installation on a single panel swinging gate” on page 15.
•
Run a bypass cable from one side of the gate to the other. See “Swinging gate
bypass cable” on page 13.
Sliding gate with cable protection
Sliding gates can be included as part of the Intelli-FLEX II zone by installing
sensor cable on the gate panel, and connecting it to the fence sensor cable with
RG-59 cables.
Figure 5-17 Double panel swinging gate
Figure 5-18 Determining RG-59 length requirements
protected gates
cable bypass (non-sensitive RG-59/U cable in conduit)
sensor cable
sensor cable
splice kit
splice kit
W
H
CL = W/2 + 8 inches
Total length of RG-59
required for each gate = CL X 2
Maximum gate width= approximately 4H
W = gate width
H = fence height
CL = length of RG-59 cable