Conquest 100
Line Scan
69
Figure 6-13: Gain is used to amplify the signal to enhance the weaker targets. The same GPR Line is displayed with
gain values of 1, 3, 5, and 8. A gain of 1 is under-gained and you might miss something. A gain of 8 is over-gained
and difficult to interpret.
6.8.6 Concrete Cal
An accurate Concrete Cal is critical for determining the depth of an object in the subsurface
(
2.3 explains the rationale of doing Concrete Cal). You should adjust this value
whenever you move to a different site (or different concrete pour).
The last used Concrete Cal is displayed on the Concrete Cal button. Once you have collected
data with one or more hyperbolas on the screen, press
Concrete Cal
; this can be done during
data collection, back-up mode or when stopped. You will see the image in Figure 6-14.
Summary of Contents for CONQUEST 100
Page 1: ... Copyright 2015 Sensors Software Inc 2015 00049 05 ...
Page 2: ......
Page 4: ......
Page 10: ......
Page 16: ...Conquest 100 Overview 6 ...
Page 46: ...Conquest 100 Main Screen 36 ...
Page 84: ...Conquest 100 Line Scan 74 ...
Page 104: ...Conquest 100 SliceView 94 ...
Page 114: ...Conquest 100 Transferring Data to a PC 104 ...
Page 116: ...Conquest 100 Transferring Data to a PC 106 ...
Page 120: ...Conquest 100 Troubleshooting 110 ...
Page 124: ...Conquest 100 Care and Maintenance 114 ...
Page 128: ...Conquest 100 Technical Specifications 118 ...
Page 130: ...Conquest 100 Appendix A Health Safety Certification A2 ...
Page 140: ...Conquest 100 Appendix C Instrument Interference C2 ...
Page 142: ...Conquest 100 Appendix D Safety Around Explosive Devices D1 ...