Io
SENSOR
Section 2 SMT-200 Operations
SMT-200 Operations and Technical Manual 2.00/R1
9
2.1 SMT-200
Layout
The SMT-200 consists of two parts, the main case and a removable battery pack. The battery pack
must be connected for mobile operation. Operation is still possible when connected to the supplied
docking station, in which case the battery does not need to be connected. If the battery pack is
attached to the main body the docking station will be monitoring the battery and will be automatically
charging the battery as required.
2.2
Switching on the SMT-200
To power up the SMT-200 simply push the
ENTER/START
key once. The unit
will beep to acknowledge the power up request. The start up screen will be
displayed while the system is going through a set of Power On Self Tests
(POST). This is a functional test of the CPU and its associated hardware.
After approximately 20 seconds the unit will beep once and the main menu
will appear after a further 20 seconds. The unit is now ready for operation. If
this is the first time the unit has been used it will need to be setup for the
particular strings to be tested. All settings are stored in non-volatile memory
and are retained even when the power is off.
SENSOR
SMT-200
GEOPHONE TESTER
Booting...
SENSOR
Nederland b.v.
SMT-200 Front View
SMT-200 Rear View
Connector for Geophone string,
Docking Station or Tag reader
Backlit LCD Display
Cusor Keys
Power on &
Start/Enter Key
Battery Pack
Numeric
Keypad
Battery
Lever