3-15
RIG
GING
Rigging information
17. Install the grommet
1
and grommet
holder
D
.
Installing the wiring harness (remote
control model)
1.
Remove the grommet holder.
2.
Remove the rigging grommet
1
.
3.
Insert the extension wiring harness
2
into the bottom cowling.
4.
Unfasten the holders
3
,
4
,
5
, and
6
,
and then remove the main wiring harness
coupler
a
.
5.
Connect the 10-pin coupler
b
, and then
fasten the main wiring harness
a
, 10-pin
coupler
b
, and extension wiring harness
2
using the holders
3
,
4
,
5
, and
6
.
6.
Install the rigging grommet
1
and grom-
met holder
7
.
Installing the remote control box and
tachometer (remote control model)
See “Remote control box operation manual”
or “Rigging guide” for the installation proce-
dures.
Installing the battery
Improper battery connections or cable
size selection may result in a fire.
If battery connections are reversed, check
the charging system and replace any
damaged components.
Rigging recommendations
Battery requirement
Make sure that the size of the battery cable
terminals is appropriate for the size of the
battery terminals.
To prevent the battery cable terminal connec-
tions from corroding, solder each battery
cable terminal to the battery cable.
D
1
1
3
6
b
a
5
2
4
Ambient temperature above 0 °C (32 °F)
Unit
Minimum capacity
CCA/EN
430.0 Amps
20HR/IEC
70.0 Ah
1
7
Summary of Contents for Kingfish 25
Page 1: ...YAMAHA MOTOR CO LTD F4A F4 Goldfish 4 Kingfish 25 SERVICE MANUAL...
Page 4: ......
Page 20: ...0 15 GEN INFO General information MEMO...
Page 45: ...1 25 SPEC Specification MEMO...
Page 65: ...2 19 TECH FEA Technical features and description MEMO...
Page 81: ...3 17 RIG GING Rigging information MEMO...
Page 215: ...7 67 POWR Power unit MEMO...
Page 229: ...LOWR Lower unit 8 11 0 A...
Page 392: ...A Appendix Wiring diagram A 1 How to use the wiring diagram A 1...
Page 394: ......
Page 395: ......