13
2 mm
WL
1.
Before cutting the wire, measure the wire from the centre of the hole in the top swaged eye terminal. Mark the
measurement WL carefully on the wire using a marker pen. (The WL measurement was calculated in
”Table
1”
, (Chapter 2.3).
2. Put adhesive tape around the wire on both sides of the cutting mark to assist cutting. Carefully cut the
wire using a hacksaw.
3 .
Unscrew the socket, wedge and former from the terminal part (or Furlex rigging screw if to be used).
Remove the toggle from the terminal part.
4.
Thread the socket onto the wire.
5.
Slide the wedge over the core (7 strands) of the wire. The core of the wire should protrude approx. 2 mm
(5/64”) from the wedge.
3.2 Fitting Sta-lok eye terminal
Note! For systems with swaged stud terminal, skip this part and go directly to 3.3.
Fig. 3.2.b
Fig. 3.2.c
Former
Wedge
Socket
Terminal part (or rigging screw)
Fig. 3.2.d
Fig. 3.2.a
Note! If compact wire is used, use the wedge that is supplied with the compact wire stay!