Seetru Quickmount Installation, Operating And Maintenance Instructions Download Page 1

Quickmount Installation, Operating and Maintenance Instructions

Issue  3

08/10/98

Page     

1

 of 

8

INSTALLATION OPERATING AND

MAINTENANCE INSTRUCTIONS

SEETRU LTD.

ALBION DOCKSIDE WORKS, HANOVER PLACE, BRISTOL BS1 6UT. ENGLAND

TEL: 0117 927 9204. FAX :0117 929 8193. EMAIL:[email protected]

SEETRU QUICKMOUNT GAUGE

GENERAL DESCRIPTION

The Seetru Quickmount gauge consists of a transparent sight tube fixed to the outside of a tank and
isolated from it by screwdown value units which may be fitted with automatic safety valves. They control
the flow of liquid to the sight tube when the gauge valves are opened to show the level in the tank.

The sight tube (1) is protected against breakage by the guard tube (2) which surrounds it apart from
windows through which the liquid level can be seen. Anti-rattle rings (3) are fitted over the sight tube and
fit the inside diameter of the guard tube. The guard tube is in turn supported by the support bracket (4)
only fitted on gauges exceeding 3ft, centre distance which is secured by screws (5) to a special pad welded
to the tank.

Gauge collars (6/7) are fitted at top and bottom ends of the sight tube. Valveless (6) may be used at both
ends whilst the bottom (7) is fitted with a drain valve. The sight tube is sealed by “0” rings (9/10) which
are compressed by the polypropylene bushes (8) when the gland nuts (11) are tightened. Slide top gauge
collar (6) over valve unit (12) and slide the gauge collar (7) over valve unit (32) which are sealed by “0”
rings (7). They are securely retained on the body of the units by retaining nuts (26) and are sealed by “0”
rings (22) to prevent leakage.

Samples of the tank content may be taken for examination by unscrewing the drain valve ferrule (18).
This drain valve is sealed against leakage by a plunger (14) fitted with “0” rings (15/16) and retained in
the ferrule by a circlip (19). It is prevented from being removed from the collar by the pin.

Both valve unit bodies are sealed to the tank boss with fibre washers (27) and contains a screwdown valve
(25/29) sealed by “0” rings (24) against leakage. The retaining clip (21) prevents the screwdown from
being removed from the unit.

The head of a screwdown valve fitted with an automatic safety valve (29) is marked “ASV”. If the sight
tube is broken, loss of liquid is prevented by the automatic shut-off valve in the valve body (28). The
abnormal flow acting on sealing ball (30) forces it forward to seal on seat in body. When valve is open
ball (30) is retained by retaining clip (31).

INSTALLATION INSTRUCTIONS

1. Valve units (12/32) must be screwed into the tank bosses and sealed by use of the fibre washers (27)
provided. Once fitted these units should not be disturbed.

Summary of Contents for Quickmount

Page 1: ... The sight tube is sealed by 0 rings 9 10 which are compressed by the polypropylene bushes 8 when the gland nuts 11 are tightened Slide top gauge collar 6 over valve unit 12 and slide the gauge collar 7 over valve unit 32 which are sealed by 0 rings 7 They are securely retained on the body of the units by retaining nuts 26 and are sealed by 0 rings 22 to prevent leakage Samples of the tank content...

Page 2: ...nuts to give a light metal to metal contact Excess tightening of the retaining nuts will provide binding between metal faces and could cause damage Care must be taken to ensure that all faces and diameters are free from burrs and are clean especially those operating on the 0 rings 4 Support brackets are fitted to all gauges which exceeds 3 centre distance and these are fixed by screws to special p...

Page 3: ...unit and that the sudden surge of liquid into an empty gauge from a full tank is a good assimilation of a broken sight tube and therefore the safety valve would close preventing the tank contents from reaching the sight tube In order to prevent this occurring the lower valve must be opened very slowly If the automatic safety valve has sealed off the sight tube normal operation may be resumed by th...

Page 4: ... complete 32 1 Screwdown valve unit complete with auto safety shut off valve comprising 13 4 Collar 0 Ring 21 1 Retaining Clip 14 1 Plunger 22 1 Retaining Nut Seal 15 1 0 Ring 23 1 Screw down Valve Seal 16 1 0 Ring 24 1 Screw down Valve Seal 17 1 Pin 26 1 Retaining Nut 18 1 Ferrule 27 1 Fibre Washer 19 1 Circlip 28 1 Body 20 1 Body 29 1 Screw down Valve 21 2 Retaining Clip 30 1 1 2 Dia Ball St Ste...

Page 5: ...aintenance Instructions Issue 3 08 10 98 Page 5 of 8 INSTALLATION OPERATING AND MAINTENANCE INSTRUCTIONS SEETRU LTD ALBION DOCKSIDE WORKS HANOVER PLACE BRISTOL BS1 6UT ENGLAND TEL 0117 927 9204 FAX 0117 929 8193 EMAIL enquiries seetru co uk ...

Page 6: ...te with gland nut 11 0 ring 9 10 and bushes 8 from lower valve collar 7 Remove anti rattle rings from sight tube where fitted 8 Clean or renew sight tube inspect all seals renew if required 9 Check internal passages of collars clear of obstruction 10 Refit sight tube 1 complete with top and bottom gland nut 11 0 rings 9 10 bushes 8 and anti rattle rings 3 where used 11 Screw lower gland nut 11 to ...

Page 7: ... 3 Completely remove ferrule 18 by unscrewing 4 Remove loose pin 17 by easing out from bore 5 Pull out plunger 14 complete with 0 rings 15 16 if required 6 Inspect and renew 0 rings 15 16 if required 7 Check internal passages of plunger 14 and collar 7 are clear 8 To re assemble place plunger 14 into collar 7 refit pin 17 9 Screw up ferrule 18 replace circlip 19 10 Refit gauge to tank using steps ...

Page 8: ...level of connection 2 Remove gauge from tank using steps 1 to 4 from Section A 3 Unscrew and remove valve unit 12 and 32 from tank boss 4 Inspect and renew washers 27 if required 5 Check tank boss face is smooth and clean 6 To re assemble screw valve unit 12 and 32 into tank boss with washer in position 7 Refit gauge to tank using steps 5 to 9 from Section A 8 Refill tank and check for leaks EMERG...

Reviews: