Step 3 — Base Tower Support Tips
Insert the 6-32 nylon lock nuts into the injection molded parts first. There will be 2 of these nuts
inserted per injection molded piece
Then install the 1/4-20 button head screws and T-SLOT nuts. Remember to only get the nut
started on the screw.
Press the bearing / cover assembly (pre-assembled by SeeMeCNC) onto the posts inline with the
1/4-20 hardware (position shown)
The two halves will be fastened together with #4 x 1/2"screws.
Complete 3 identical assemblies.
Step 2. REV2 Rostock Max v3 Base Assembly
Draft: 2018-07-27
Guide ID: 66 -
This document was generated on 2019-10-01 12:14:14 AM (MST).
© 2019
seemecnc.dozuki.com/
Page 4 of 12