Rostock MAX v2 Assembly Guide
6 – Installing the Towers & Tower Wiring
Running Wire in the Towers
For this task, you'll need the following components:
Note that the end stop wires can be found in the same bag that contained the thermistor leads.
The 26ga red & black wires are supplied as one continuous length. The wire is meant to be
used to provide power for the PEEK and layer fans on the effector platform. Before you can run those
wires in the tower, you'll need to cut the red & black wires in half so you have two red & black pair of
equal length.
In the Rostock MAX v2, you'll be routing the hot end, extruder stepper and end stop wiring
through the center of the three towers. If you're upgrading a Rostock MAX v1 and using the original
towers, please make sure to gently file off any sharp edges on either end of each tower.
In order to do this, you're going to have to strip the outer jacket from both four conductor
cables. This is very easy to do, but there IS a bit of a trick to it. :)
79
3 Aluminum Towers
18ga, 4 Conductor Wire
22ga, 4 Conductor Wire
26ga wire, Red & Black
End Stop Wires
Summary of Contents for Rostock MAX v2
Page 25: ...Rostock MAX v2 Assembly Guide Melamine Parts Sheet 1 25 ...
Page 26: ...Rostock MAX v2 Assembly Guide Melamine Parts Sheet 2 Melamine Parts Sheet 3 26 ...
Page 27: ...Rostock MAX v2 Assembly Guide Melamine Parts Sheet 4 27 ...
Page 171: ...Rostock MAX v2 Assembly Guide 171 Fig 14 8 Spool holder support installed ...