Summary of Contents for Mig-29 3D EDF ARF
Page 4: ...Remove each part from its bag and protection Remove the canopy from the fuselage...
Page 8: ...Make sure to check the alignment on the top of the wing panel to the fuselage...
Page 11: ...Apply a light coat of 5 minute epoxy on the stabiliser panel...
Page 13: ...Hold pressed the stabilizer panel in his position on fuselage...
Page 14: ...Connect the elevator linkage in servo arm...
Page 16: ...Locate the rudder and connect the rudder servo connector matching the polarity...
Page 19: ...Install on fuselage the nose cone using 5 minute epoxy...
Page 21: ......
Page 23: ...PROGRAMMING EXAMPLE ON JR PROPO RADIO...
Page 31: ...High rate 100 40 up down High rate 100 30 right left MIXING...