11
MASTERMIX™ STORAGE TANKS
MACHINE OPERATION
6-DISCHARGE MATERIAL OUT OF TANK
Open
Main valve
Open
Discharge valve
Close
Return back valve
Close
Recirculation valve
Start Engine. Pull Material control lever handle in forward
position.
WHEN FINISHED: Empty the discharge hoses. –
Stein Pump Only
Close
Main valve
Close
Discharge valve
Open
Return back valve
Open
Recirculation valve
1
5
4
2
1
2
4
5
36
DISCHARGE VALVE
36
RECIRCULATION
VALVE
36
RETURN BACK
VALVE
36
MAIN VALVE
1
2
4
5
3
Summary of Contents for MasterMix Bulk
Page 1: ......
Page 30: ...29 MASTERMIX STORAGE TANKS PUMP DIAGRAM ...
Page 42: ...41 PARTS FOR ELECTRICAL SET UP ...
Page 43: ...42 ...
Page 44: ...43 ...
Page 45: ...44 ...
Page 46: ...45 ...