31
CRACK PRO® MASTIC MACHINE
OPERATING INSTRUCTIONS - DIESEL FUEL BURNER
ADDING MATERIAL
3.
Starting
COLD
, put 10 to 15 blocks. If the machine is
EMPTY
,
throw in 15 to 25 boxes. Wait approximately 30 minutes after oil
temperature hits 500° deg. You should see the blocks melted
about 50%. Add 10 boxes every 7-10 minutes until you reach
approximately 90-100 boxes. This will be considered a full load
depending on the specific product.
4.
Be sure to empty the machine to 1/3 or lower when shutting
down for the night. Leaving to much material in the machine will
result in slower heat-up time the next day.
MATERIAL TEMPERATURE
5.
On the top rear Driver side, is the thermometer for Heat Transfer
oil and Material. The thermometer will correspond with the digital
readouts on the control box.
6.
If the material temperature starts to climb over the
recommended pouring temperature, open the lid, and add more
blocks. Leaving the lid open will also help drop the temperature,
or lower the temperature setting on the oil controller.
Summary of Contents for Crack Pro 250
Page 1: ......
Page 8: ...8 SAFETY PRECAUTIONS AND CAUTIONS FIRST AID ...
Page 20: ...20 ...
Page 21: ...21 ...
Page 22: ...22 ...
Page 23: ...23 ...
Page 24: ...24 ...
Page 25: ...25 ...
Page 26: ...26 ...
Page 27: ...27 ...
Page 37: ...37 WIRING DIAGRAMS TEMPERATURE CONTROL BOX ...
Page 38: ...38 WIRING DIAGRAMS TEMPERATURE CONTROL BOX ...
Page 39: ...39 MASTIC MACHINE CONNECTOR J1 ...
Page 41: ...41 WIRING DIAGRAMS ALL THE WIRING COMES OUT OF THE CONTROL BOX TO THE LIGHTS ...