![SealMaster CRACK PRO 125 Owner'S Manual Download Page 32](http://html.mh-extra.com/html/sealmaster/crack-pro-125/crack-pro-125_owners-manual_1227839032.webp)
32
CRACK PRO® HEATED HOSE MACHINE
OPERATING INSTRUCTIONS - DIESEL FUEL BURNER
THE TEMPERATURE CONTROL
After starting the engine:
1.
Turn
on
the burner with power on-off switch located on the front
of the digital temperature controller. The digital controllers
monitor the heat transfer oil temperature, and the material
temperature, along with the heated hose.
2.
Turn
on
the a/c power switch. The controller will cycle the burner
off and on as the temperature of the heat transfer oil increases
and decreases. The heat from the transfer oil will be absorbed by
the material in the tank.
TRANSFER OIL
TEMP. SET
BURNER CONTROL
SWITCH
HEATED HOSE
TEMP. SET
A/C POWER
SWITCH
MATERIAL
TEMP. SET
Summary of Contents for CRACK PRO 125
Page 1: ......
Page 9: ...9 SAFETY PRECAUTIONS AND CAUTIONS FIRST AID ...
Page 22: ...22 ...
Page 23: ...23 ...
Page 24: ...24 ...
Page 25: ...25 ...
Page 26: ...26 ...
Page 27: ...27 ...
Page 28: ...28 ...
Page 29: ...29 ...
Page 40: ...40 HEATED HOSE MAIN CONNECTOR J1 AND HEATED HOSE J2 ...
Page 62: ...62 CRACK PRO HEATED HOSE MACHINE MACHINE PICTURES AND PARTS LIST ROPER 2 PUMP PUMP DIAGRAM ...
Page 69: ...69 HEATED HOSE MAIN CONNECTOR J1 AND HEATED HOSE J2 TIMES 2 CP 260 DOUBLE PUMPER OPTIONAL ...