13
CRACK PRO® HEATED HOSE MACHINE
PRE-OPERATION INSTRUCTIONS
CHECK LIST
THE ENTIRE UNIT SHOULD BE CHECKED
Even though your Crack Pro joint sealing machine is ready for
operation when you receive it, certain items should be checked before
putting it to use.
If you have any questions on the operation of this machine discontinue
operation of the machine and call the factory immediately.
(419-626-4375)
Most important items to check are listed below:
Check nuts, set screws, and bolts to assure that no loosening
occurred doing shipment.
Check tightness of all heat transfer oil HTO hoses. (steel braided
hoses)
Check to be sure the HTO vent pipe is clear and open for venting,
located on the HTO expansion tank.
Check wheel lug nuts after first 100 miles of travel.
Never operate machine unattended.
Never exceed heat transfer oil limit of 500°F when operating.
Do not expose material hose to direct flame.
Close tank lid before transporting.
Summary of Contents for CRACK PRO 125
Page 1: ......
Page 9: ...9 SAFETY PRECAUTIONS AND CAUTIONS FIRST AID ...
Page 22: ...22 ...
Page 23: ...23 ...
Page 24: ...24 ...
Page 25: ...25 ...
Page 26: ...26 ...
Page 27: ...27 ...
Page 28: ...28 ...
Page 29: ...29 ...
Page 40: ...40 HEATED HOSE MAIN CONNECTOR J1 AND HEATED HOSE J2 ...
Page 62: ...62 CRACK PRO HEATED HOSE MACHINE MACHINE PICTURES AND PARTS LIST ROPER 2 PUMP PUMP DIAGRAM ...
Page 69: ...69 HEATED HOSE MAIN CONNECTOR J1 AND HEATED HOSE J2 TIMES 2 CP 260 DOUBLE PUMPER OPTIONAL ...