Section 5: INSTALLATION CHECKLIST AND SUPPLIES
Please Complete Checklist and E-mail to
or telefax to +1.410.326.1199
5.0 Installation Checklist
Mechanical Checklist (reference Installation Manual Section 1)
Seakeeper Foundation Installed in Hull
Foundation bolts torqued to specification
Electrical Checklist (reference Seakeeper Drawing 90257 & Installation Manual Section 2)
Mount Components
Display (near helm)
Connect Customer Supplied Cables
Cable 1 (Seakeeper supplied)
– Connect Cable 1 from Seakeeper 24VDC power
at customer supplied connection box, or
directly to a circuit breaker.
– Plug connector of Cable 1 into mating
connector on the Seakeeper wire harness
Cable 6 (customer supplied)
– Install lugs on both ends of customer supplied
10 AWG ground cable
– Connect one end of Cable 6 to nearest vessel
ground and other end to Seakeeper rear brace
Connect Seakeeper Supplied Cables
Cable 2 (Seakeeper supplied)
– Connect Cable 2 from Drive Box to 230 VAC
single phase at customer supplied connection
box or directly to circuit breaker
Cable 5 (Seakeeper supplied)
– Connect Cable 5 from Drive Box to customer
supplied 230 VAC seawater pump