background image

4–TEC SC Models

UNCRATING

UNCRATING

Crate Cover

1

2

2

F00A2A6

Carefully lay the crate on its bottom.

CAUTION:

Allowing the crate to drop may cause

serious damage to the watercraft.

Using a drill or a screwdriver, remove all screws
[[[[1]]]] retaining crate cover to crate base.

Assisted by another person, lift up crate cover [[[[2]]]].

N

N

N

NO

O

O

OT

T

T

TE

E

E

E::::

Do not tip cover toward the front or back of

the watercraft. Raise cover vertically [[[[2]]]] from both
ends at the same time.

Remove parts from the watercraft’s rear storage
compartment.

Lifting the watercraft

1

3

2

F08A056

Cut strapping at watercraft front eyelet.

Release [[[[1]]]] the shipping bracket [[[[2]]]] at the rear of
the watercraft from the crate base [[[[3]]]].

Lift the watercraft using the appropriate lift kit and
install it on a proper support.

Shipping Bracket

1

3

2

F08A066

Remove the shipping bracket [[[[1]]]] from the venturi.

Discard the shipping bracket and the hexagonal
bolts [[[[2]]]].

Keep the flat washers [[[[3]]]].

Predelivery

2004-1

3 / 15

Summary of Contents for Bombardier GTX 4-TEC

Page 1: ...ri 5 Access Door 5 FINAL PREPARATION 5 Steering Alignment 5 O P A S System Alignment 6 Recommended Fuel 6 Fuel System Pressurization 7 Coolant Level 7 Watercraft Identification 8 Programming Keys With...

Page 2: ...tions and or specifications in this document Bombardier reserves the right at any time to discontinue or change specifications designs features models or equipment without incurring obligation The ill...

Page 3: ...t or back of the watercraft Raise cover vertically 2 from both ends at the same time Remove parts from the watercraft s rear storage compartment Lifting the watercraft 1 3 2 F08A056 Cut strapping at w...

Page 4: ...flat washer from section no 1 of predelivery kit 1 nut from section no 1 of predelivery kit Secure the BLACK negative cable to the battery negative post with 1 hexagonal bolt from section no 1 of pre...

Page 5: ...eviously removed Torque to 21 N m 15 lbf ft Access Door 1 F02L3X7 Open the front storage compartment cover Remove the storage tray Secure the access door 1 with 7 plastic darts from section no 2 of pr...

Page 6: ...uel Fuel type RECOMMENDED Premium unleaded gasoline with 91 octane RON MON 2 specification for optimum performance MINIMUM Regular unleaded gasoline with 87 octane RON MON 2 specification At predelive...

Page 7: ...System Pressurization WARNING At PDI whenever doing any type of repair on the watercraft or if any components of the fuel system are disconnected a pressure test must be done before starting the engi...

Page 8: ...watercraft identification or to program a safety lanyard use Bombardier Utility and Diagnostic Software B U D S in conjunction with the VCK N N N NO O O OT T T TE E E E Make sure to use B U D S versio...

Page 9: ...ea Doo Learning Key white key with Sea Doo LK written on it click on ADD LEARNING KEY 2 button on bottom of screen N N N NO O O OT T T TE E E E This key limits vehicle top speed to approximately 55 km...

Page 10: ...TION Never run engine longer than 5 minutes Drive line seal has no cooling when watercraft is out of water 1 3 2 F18D2N6 Reinstall dipstick push in completely Remove dipstick and read oil level It sho...

Page 11: ...late s a slight play should be obtained With the throttle lever released it must have a free play of 0 5 4 mm 1 64 5 32 in in the cable CAUTION Improper cable adjustment will cause strain on cable and...

Page 12: ...pump and engine Complete Predelivery Check List Test run watercraft DELIVERY TO CUSTOMER Decal Protective Films N N N NO O O OT T T TE E E E Protective film on decals must be removed Slowly peel off p...

Page 13: ...ety lanyard 2 or 3 times to initially feed the fuel system Handlebar Tag N N N NO O O OT T T TE E E E A tag is tied to the handlebar Let it in place until delivery and make sure purchaser reads it Bre...

Page 14: ...ition TPS 1 6 k 2 4 k Crankshaft Position CPS 190 290 Manifold Air Temperature MATS 2 280 k 2 740 k 20C Water Temperature WTS 2 280 k 2 740 k Manifold Air Pressure MAPS 6040 terminals 2 1 5554 termina...

Page 15: ...ing Nozzle Pivoting Angle 0 to 20 Minimum Required Water Level 90 cm 35 in Outside Diameter 155 3 mm 6 115 in Impeller Material Stainless steel L L L LI I I IQ Q Q QU U U UI I I ID D D DS S S S Fuel T...

Reviews: