INTRODUCTION
Mounting in Tandem
1) Apply retaining compound on internal element
bore.
2) Continue to assemble as shown above.
CASE-IN COMPONENTS
Metallic Gaskets
A00A3VA
1
1. Proper strength Loctite
– Clean inner housing diameter and outer gasket
diameter.
– Spray housing and gasket with Loctite Primer N
(P/N 293 800 041).
– Apply a strip of proper strength Loctite on lead-
ing edge of outer metallic gasket diameter.
NOTE:
Any Loctite product can be used here. A
low strength liquid is recommended as normal
strength and gap are required.
– Install according to standard procedure.
– Wipe off surplus.
– Allow it to cure for 30 minutes.
NOTE:
Normally used on worn-out housings to
prevent leaking or sliding.
It is generally not necessary to remove gasket
compound applied on outer gasket diameter.
XXIII
www.SeaDooManuals.net
Summary of Contents for 2006 GTI
Page 1: ...Smr 2004 ang FH8 Thu Jun 03 14 42 10 2004 Page 1 www SeaDooManuals net ...
Page 795: ...F17Z03 www SeaDooManuals net ...
Page 796: ...F17Z05 www SeaDooManuals net ...
Page 797: ...F17Z04 www SeaDooManuals net ...
Page 798: ...F17Z06 www SeaDooManuals net ...
Page 799: ...F08Z03 www SeaDooManuals net ...
Page 800: ...F18Z1A www SeaDooManuals net ...
Page 801: ...Smr 2004 ang FH8 Thu Jun 03 14 42 10 2004 Page 1 www SeaDooManuals net ...