
ZAA2300 ManualZAA2300 Manual
23. September 2021
© Copyright 2021, PROCEQ SA
27
6 Turning the glass plate
Make sure that the start stop (1) and the drawing unit (22) are positioned in the very
back of the device and that the clamping device (5) is released.
Lift the weight (7) and hinge it into the top position of the holding device (9).
open the swiveling holders (8) on both sides.
Remove the polyester foil.
Carefully lift the heating plate at its front edge and pull it out of the apparatus.
Remove the glass plate and carefully place it on the apparatus with the desired side up.
Secure the glass plate with the swiveling holders (8)