
7.2 POWER DOWN FEED
7.2A POWER DOWN FEED SET-UP AND MAINTENANCE
SEE FIGURE 15 ON THE FOLLOWING PAGE.
1. Before powering the saw, check the oil level in the reservoir (A). There is a sight glass in the
2. Slide the shuttle valve (D) to its CLOSED position and connect the air supply.
3. Slide the shuttle valve to its OPEN position and adjust the air pressure regulator.
90 PSI (6.2 BAR) is the minimum operating pressure. 105 PSI (7.2 BAR) is the maximum.
4. Without powering the saw, manually cycle the head up and down several times, to purge the air
out of the lines. The head may cycle irregularly the first few cycles.
5. After cycling the head, shut the flow control valve (B) off. Then, open it one turn.
Page 36
back of the reservoir. The head must be in the full UP position. Use a SAE 10W (ISO 32)
non-foaming hydraulic oil, such as Mobil DTE 10 or equivalent.
The power down feed option, used in conjunction with the power vise option, changes a manual
saw into a semi-automatic saw. These options will increase productivity and reduce operator
fatigue. The power down feed option cannot be retrofit to machines with serial number 11940491
and prior in the field. This option can be used on machines with or without the power vise option.
CAUTION : ALWAYS DISCONNECT THE AIR SUPPLY BEFORE REMOVING THE
FILLER PLUG FROM THE RESERVOIR. IF THE FILLER PLUG IS
REMOVED WHILE THE MACHINE IS CONNECTED TO THE AIR
PRESSURE, THE FLUID IN THE TANK WILL BE PURGED THROUGH
THE OPENING UNDER PRESSURE.
Summary of Contents for B2153NF
Page 10: ...FIGURE 1 A B C G H I F VISE D E FIGURE 1 Page 9 A B C G H I F VISE D E...
Page 11: ...Page 10 4 2 MACHINE MOVING PROCEDURES SEE FIGURE 2 BELOW FIGURE 2...
Page 14: ...Page 13 CPO 350 NF PK PD FIGURE 3B...
Page 18: ...Page 17 FIGURE 4 FIGURE 5...
Page 20: ...Page 19 FIGURE 6...
Page 28: ...Page 27 FIGURE 9 FIGURE 10...
Page 30: ...Page 29 FIGURE 11...
Page 34: ...Page 33 FIGURE 13...
Page 36: ...Page 35 FIGURE 14...
Page 38: ...Page 37 FIGURE 15...
Page 40: ...Page 39 FIGURE 16...
Page 42: ...Page 41 FIGURE 17...
Page 44: ...Page 43 FIGURE 18...
Page 46: ...Page 45 FIGURE 19...
Page 48: ...Page 47 FIGURE 20...
Page 50: ...Page 49 FIGURE 21...
Page 58: ...FIGURE 24 Page 57...
Page 62: ...Page 61 FIGURE 26...
Page 66: ...Page 65 FIGURE 28...
Page 68: ...FIGURE 29 Page 67 Q P R S N M O L K J I H G F E D C B A 660255 660255...
Page 70: ...Page 69 FIGURE 30 SERIAL S B1823NF0709 UP...
Page 74: ...Page 73 FIGURE 32...
Page 76: ...FIGURE 33 Page 75 From Item T tee to Item D flow control Valve is 96...
Page 78: ...Page 77 FIGURE 34...
Page 80: ...Page 79 FIGURE 35...
Page 82: ...Page 81 FIGURE 36...
Page 84: ...Page 83 FIGURE 37...
Page 86: ...Page 85 FIGURE 38...