Figure 5-44 Sample Rack Installation
9. Press
Next
.
The Position1 Adjustment screen is shown, and the needle moves to
Position1
.
10. Press
Parallel movement
and
Vertical movement
to move the tip of the needle (A) to the center of
the positioning hole (a).
Hardware User Guide
ExionLC
™
100 System
RUO-IDV-05-1839-C
150 / 219
Service and Maintenance