2.5
Placing booms
2.5.1
Unfold placing boom
Only raise a mobile placing boom from the driving position once the
machine has been supported in accordance with the Operating In‐
structions. Stationary placing booms may only be raised after the
proper set-up has been checked by a subject expert.
Only raise the placing boom in the sequence described in the Operat‐
ing Instructions. The correct sequence depends on the “Folding sys‐
tem” (roll-and-fold system, Z fold system, etc.).
Do not carry out more than one movement at a time. If a movement is
stopped, the entire volume of fluid is available for the remaining
movements, and can increase their speeds. Depending on the de‐
sign, it may be the case that carrying out several movements at once
(as opposed to carrying out a single movement at maximum speed at
any one time) does not bring any advantage in terms of time. Carry‐
ing out several movements at once requires an increased level of at‐
tentiveness.
The range of a radio remote control is long enough for the machine to
receive control commands (e.g. from a great distance, from inside en‐
closed spaces) even without visual contact. If there is no visual con‐
tact, for example, because you are changing workplace, you must
switch off the remote control. If there is no visual contact, for exam‐
ple, because the construction site is unclear, signallers MUST be
used, and must remain in contact with the machine operator using
suitable means, and have visual contact with the site of concrete
placement, work areas and danger zones, and the machine.
Always ask the site management to provide you with an assistant to
act as a signaller. Agree clear hand signals or other signals with the
signaller so that you can communicate with each other. You should
position the signaller such that he can always observe the whole of
the placing boom. Your primary duty as the machine operator is to
observe the site of concrete placement.
Only slew the placing boom over persons when the delivery line and
end hose are empty. There is a risk of concrete falling out of the end
hose.
Safety Manual
Concrete delivery and placing machines
42
01/2018 Rev16 EN
Summary of Contents for SP 1800
Page 1: ...SP 1800 SP 2800 CAT Original operating instructions Stationary concrete pump...
Page 14: ...2 Introduction 12 Trennblatt Einleitung EN fm 01 00 01...
Page 22: ...2 2 Structure of the operating instructions 20 Aufbau BA EN fm 01 05 01...
Page 30: ...2 5 Labelling SCHWING machines 28 Maschinenkennzeichnung SP EN fm 01 04 00...
Page 38: ...2 6 Technical data for SP 1800 2800 CAT 36 Techn Daten SP 1800 2800 CAT EN fm 01 00 00...
Page 68: ...3 Operation 66 Trennblatt_Kapitel Betrieb EN fm 01 00 00...
Page 78: ...3 3 Electrical connection optional 76 Elektrischer Anschluss EN fm 01 10 00...
Page 82: ...3 4 EMERGENCY STOP system for SP 1800 2800 80 Not Halt System SP 1800 2800 EN fm 01 02 00...
Page 98: ...3 6 Drive circuit SP 1800 2800 96 Antriebsschaltung SP 1800 2800 EN fm 01 06 00...
Page 128: ...3 8 Operating the pumping line 126 Foerderleitung_Betrieb EN fm 01 15 03...
Page 164: ...3 16 Control of operations SP 1800 2800 162 Betriebsueberwachung SP 1800 2800 EN fm 01 00 00...
Page 181: ...3 18 Cleaning Reinigung EN fm 01 18 04 179 Fig 124 Trap basket Fig 125 Cleaning head...
Page 190: ...3 18 Cleaning 188 Reinigung EN fm 01 18 04...
Page 214: ...3 21 Difficult operating conditions 212 Erschwerter Betrieb EN fm 01 08 01...
Page 218: ...3 23 Technical preconditions for concreting 216 Betontechnologische Vorauss EN fm 01 04 01...
Page 220: ...4 Maintenance 218 Trennblatt_Kapitel Wartung EN fm 01 00 01...
Page 228: ...4 2 Consumable volumes in litres 226 Betriebsstoffmengen SP EN fm 01 00 00...
Page 240: ...4 3 Recommended lubricants and fuels 238 Schmier Betriebstoffempfehlung EN fm 01 22 01...
Page 244: ...4 4 Spare parts and accessories 242 Ersatzteile Zubehoer EN fm 01 05 02...
Page 266: ...4 9 Pressure checks stationary concrete pumps 264 Druckkontrolle SP EN fm 01 01 01...
Page 286: ...4 12 Rock valve 284 Rockschieber EN fm 01 17 01...
Page 305: ...4 15 Multi part pumping pistons optional Mehrteilige Foerderkolben EN fm 01 00 02 303 Fig 204...
Page 306: ...4 15 Multi part pumping pistons optional 304 Mehrteilige Foerderkolben EN fm 01 00 02...
Page 313: ...4 16 Servicing the pumping line Wartung Foerderleitung EN fm 01 15 01 311 Fig 208 Fig 209...
Page 325: ...4 16 Servicing the pumping line Wartung Foerderleitung EN fm 01 15 01 323 Fig 214...
Page 326: ...4 16 Servicing the pumping line 324 Wartung Foerderleitung EN fm 01 15 01...
Page 354: ...4 20 Repair welding 352 Reparaturschweissen EN fm 01 05 01...
Page 355: ...Trennblatt_Kapitel Fernsteuerung EN fm 353 5 Remote control...
Page 356: ...5 Remote control 354 Trennblatt_Kapitel Fernsteuerung EN fm 01 00 00...
Page 365: ......
Page 366: ......
Page 368: ......
Page 371: ......
Page 374: ...6 Special equipment 358 Trennblatt_Kapitel Sonderausstattung EN fm...
Page 380: ...6 1 Hydraulic shut off assembly 98383777 364 Hydraulischer Absperrschieber EN fm 01 00 01...
Page 392: ...6 3 Remote pressure cut off DAF 376 Druckabschneidung fernverstellbar EN fm 01 00 00...
Page 393: ...Trennblatt_Kapitel Anhang EN fm 377 7 Appendix...
Page 394: ...7 Appendix 378 Trennblatt_Kapitel Anhang EN fm...
Page 416: ...7 3 Always Ready 400 Always Ready EN fm 01 01 01...
Page 418: ...7 4 VDMA safety manual 402 Vorwort Sicherheitshandbuch VDMA EN fm 01 00 01...
Page 419: ...Safety Manual Concrete delivery and placing machines 01 2018 Rev16 EN...
Page 426: ...8 01 2018 Rev16 EN...
Page 428: ...10 01 2018 Rev16 EN...
Page 448: ...30 01 2018 Rev16 EN...
Page 474: ...56 01 2018 Rev16 EN...
Page 476: ...58 01 2018 Rev16 EN...
Page 490: ...72 01 2018 Rev16 EN...
Page 491: ......
Page 492: ......