background image

© Ernst Schweizer AG

Ernst Schweizer AG, Metallbau

CH-8908 Hedingen

T41 44 763 61 11

T41 44 763 61 19

www.schweizer-metallbau.ch

Mounting instructions - MSP-FR-EW

technical changes reserved

27.03.2015/BRX

page  1/12  

Solar systems of Schweizer:

Mounting instructions – MSP-FR-EW flat 

roof PV mounting system

Legend to mounting instructions

proMSP

Observe additional information

Audible clicking sound

!

Caution: check carefully

 

Mounting direction of part

 

Correct operation

 

Tool type / required torque

Incorrect operation

    

Part identification

Summary of Contents for MSP-FR-EW

Page 1: ... EW technical changes reserved 27 03 2015 BRX page 1 12 Solar systems of Schweizer Mounting instructions MSP FR EW flat roof PV mounting system Legend to mounting instructions proMSP Observe additional information Audible clicking sound Caution check carefully Mounting direction of part Correct operation Tool type required torque Incorrect operation Part identification ...

Page 2: ... use Schweizer cannot be held liable for damage or loss resulting from the failure to observe these installation ins tructions especially the safety instructions or through misuse of the product Responsibilities of the customer and installer The customer and installer are responsible for observing the following relevant points Ensuring compliance with all relevant accident prevention regulations a...

Page 3: ...ew not supplied by Schwei zer The customer must ensure compliance with current rules and codes The standards or the equivalent applicable regional standards for the design and installation of lightning protection grounding and equipotential bonding must be observed DIN EN 62305 lightning protection DIN VDE 0185 Parts 1 4 lightning protection DIN VDE 0100 Part 410 grounding DIN VDE 0105 operation o...

Page 4: ...ers north south direction by 13 20 meters east west direction is per mitted to avoid unnecessary stresses on the membrane roof covering from thermal expansion The minimum allowable friction coefficient between the protection sheet and the roofing membrane is 0 3 Suitable for environmental conditions within the range of normal environmental corrosively e g at least 1 km from sea coasts and in more ...

Page 5: ...be performed off the roof 1 Separate pieces of the required lengths from the fleece roll protection sheet MSP FR EW PSF in the required quantity as indicated in the proMSP software report Two different lengths may be required to match the length of base profiles MSP FR EW BP used The roll is divided into perforated sections and can be easily pulled apart without the use of a knife or cutting tool ...

Page 6: ... MSP FR EW SL and place it appropriately Note Ensure the correct base profile MSP FR EW BP length is used it will be the shorter one if two lengths are being used Figs 9 and 10 Assemble connection channels Note No loose screws MSP FR S will be needed on the roof since they are all preassembled in the preceding steps 1 Fix the shorter connection channels MSP FR EW C running in the east west directi...

Page 7: ...st west direction On the outside of the panel block a cable tray can be attached to the base profiles MSP FR EW BP at least 300 mm spanning across two and screwed into place Two screws MSP FR S are required per cable tray each on a separate base profile 3 Free running cable trays can be positioned by using additional base profiles MSP FR EW BP with correctly attached protection sheet positioned at...

Page 8: ...ue of 10 Nm The clamps positioned on high supports MSP FR EW SH should be tightened before tightening the corresponding clamps positi oned on the low supports MSP FR EW SL 3 After tightening the clamps flanges should overlap the panel frames by a minimum of 7 mm Fig 25 Cover cable trays Note This step shows an option for attaching cable trays The cable tray covers are not provided Fig 26 Grounding...

Page 9: ...allbau ch Mounting instructions MSP FR EW technical changes reserved 27 03 2015 BRX page 9 12 Solar Energy Systems Mounting instructions MSP FR EW flat roof PV mounting system 1 2 4 5 6 7 8 9 11 3 10 MSP FR CH8 proMSP MSP FR GS 6x60 MSP FR S M6x60 MSP PR MC MSP FR EW C MSP FR EW PSF MSP PR EC MSP FR EW BP MSP FR EW SL MSP FR EW SH ...

Page 10: ... Telefax 41 44 763 61 19 www schweizer metallbau ch Mounting instructions MSP FR EW technical changes reserved 27 03 2015 BRX page 10 12 Solar Energy Systems Mounting instructions MSP FR EW flat roof PV mounting system proMSP PROFIS Solar proMSP proMSP proMSP proMSP 8B 8A 7B 7A 6 1 2 3 4 5 ...

Page 11: ... 763 61 11 Telefax 41 44 763 61 19 www schweizer metallbau ch Mounting instructions MSP FR EW technical changes reserved 27 03 2015 BRX page 11 12 Solar Energy Systems Mounting instructions MSP FR EW flat roof PV mounting system proMSP 9 10 11 16 12B proMSP 13 14 15 17 12A proMSP ...

Page 12: ...41 44 763 61 11 Telefax 41 44 763 61 19 www schweizer metallbau ch Mounting instructions MSP FR EW technical changes reserved 27 03 2015 BRX page 12 12 Solar Energy Systems Mounting instructions MSP FR EW flat roof PV mounting system 18 19A 19B 20 21 25 26 23A 23B 24B 24A 22 ...

Reviews: