4.63
Date Code 20081022
Instruction Manual
SEL-787 Relay
Protection and Logic Functions
Demand Metering
Figure 4.40
Loss-of-Potential (LOP) Logic
Demand Metering
The SEL-787 provides demand and peak demand metering, selectable
between thermal and rolling demand types, for the following values:
Either Winding 1 or Winding 2 currents:
➤
IA, IB, IC, phase currents (A primary)
➤
IG Residual ground current
(A primary; IG = 3I0 = IA + IB + IC)
➤
3I2 Negative-sequence current (A primary)
shows the demand metering settings. Also refer to
and
for other related
information for the demand meter.
60
S
R
Q
Q
0
0
60
1
0
LOP
| V1 | > 5 V
Δ
| V1 | > 20%
Δ ∠
I1 > 10˚
| I1 |> 0.1 • INOM
Δ ∠
I2 > 10˚
| I2 | > 0.1 • INOM
Δ ∠
I0 > 10˚
| I0 | > 0.1 • INOM
| V2 | < 5 V
| V0 | < 5 V
| V1 | > 0.75 • VNOM*1000
√
3*PTR
(RESET has priority)
Note: INOM is 1 A or 5 A depending on the part number and VIWDG.
INOM is the phase secondary input rating. VNOM and VIWDG are relay settings.
Timer PU and DO times
are in cycles.
Relay
Word
Bit
Summary of Contents for SEL-787
Page 1: ...20081022 SEL 787 Transformer Protection Relay Instruction Manual PM787 01 NB ...
Page 6: ...This page intentionally left blank ...
Page 12: ...This page intentionally left blank ...
Page 18: ...This page intentionally left blank ...
Page 78: ...This page intentionally left blank ...
Page 206: ...This page intentionally left blank ...
Page 280: ...This page intentionally left blank ...
Page 334: ...This page intentionally left blank ...
Page 376: ...This page intentionally left blank ...
Page 388: ...This page intentionally left blank ...
Page 474: ...This page intentionally left blank ...
Page 508: ...This page intentionally left blank ...