Protection Applications Examples
230 kV Tapped Transmission Line Application Example
Philosophy
System Protection Philosophy
SEL-421 Relays located at each of the three 230 kV terminals protect the tapped
230 kV transmission line; the relays operate in the DCB (directional comparison
blocking) trip scheme. Zone 1 distance protection also operates in the DUTT
(direct underreaching transfer trip) scheme. When the high-side MOD is closed,
the SEL-421 at Substation T direct transfer trips the other two terminals if a
115 kV circuit breaker fails to operate or an autotransformer failure occurs; the
SEL-421 at Substation T also receives direct transfer trip commands from Sub-
station S and Substation R.
Autoreclose Philosophy
for a timing diagram of the complete autoreclose cycle.
Use the SEL-421 to provide autoreclose at Substation T as follows.
Circuit Breaker BK1T
➤
If the high-side MOD is closed and the synchronism check across
Circuit Breaker BK1T with respect to the 230 kV potential is
successful for at least four seconds, the SEL-421 recloses Circuit
Breaker BK1T in five seconds total.
➤
If the high-side MOD is open and the 115 kV system has been
energized for at least four seconds, the relay recloses Circuit Breaker
BK1T in five seconds total.
Circuit Breaker BK2T
➤
If Circuit Breaker BK1T recloses and the synchronism check is
successful across Circuit Breaker BK2T with respect to the 230 kV
potential for at least four seconds, the SEL-421 recloses Circuit
Breaker BK2T in five seconds total.
➤
If the high-side MOD is open, Circuit Breaker BK1T recloses, and
the 115 kV system has been energized for at least four seconds, the
relay recloses Circuit Breaker BK2T in five seconds total.
Figure 6.51
Automatic Restoration Timing Diagram
Initial operation
230 kV line dead
MOD
opens
MOD open
MOD closed
0
2s
5s
10s
15s
20s
25s
230 kV line
reclosed
MOD closes
if 230 kV line
is hot
MOD locked open if:
230 kV line is dead
BK1T closes if:
(1) Synch-check
successful
(2) MOD closed
BK1T closes if:
(1) 115 kV source
is
hot
(2) MOD is
locked
open
BK2T closes if:
(1) BK1T closed,
(2) Synch-check
successful
(3) MOD closed
BK2T closes if:
(1) 115 kV source
is
hot
(2) MOD is locked open
(3) BK1T is closed
Summary of Contents for SEL-421-4
Page 6: ...This page intentionally left blank ...
Page 14: ...This page intentionally left blank ...
Page 30: ...This page intentionally left blank ...
Page 104: ...This page intentionally left blank ...
Page 128: ...This page intentionally left blank ...
Page 536: ...This page intentionally left blank ...
Page 584: ...This page intentionally left blank ...
Page 616: ...This page intentionally left blank ...
Page 696: ...This page intentionally left blank ...
Page 750: ...This page intentionally left blank ...
Page 755: ...Instruction Manual PM400 01 NB SEL 400 Series Relays Instruction Manual 20171006 ...
Page 776: ...This page intentionally left blank ...
Page 932: ...This page intentionally left blank ...
Page 976: ...This page intentionally left blank ...
Page 1024: ...This page intentionally left blank ...
Page 1038: ...This page intentionally left blank ...
Page 1064: ...This page intentionally left blank ...
Page 1128: ...This page intentionally left blank ...
Page 1206: ...This page intentionally left blank ...
Page 1316: ...This page intentionally left blank ...
Page 1350: ...This page intentionally left blank ...
Page 1464: ...This page intentionally left blank ...
Page 1468: ...This page intentionally left blank ...
Page 1492: ...This page intentionally left blank ...
Page 1518: ...This page intentionally left blank ...