Commissioning Test Worksheet
SEL-387E Relay
Page
1 of 2
Date Code 20010521
S
YSTEM
I
NFORMATION
System Settings
RID (Relay identification) =
TID (Terminal identification) =
MVA (Maximum transformer rating) =
Winding 1
Winding 2
Winding 3
Current transformer
connection:
W1CT =
W2CT =
W3CT =
Current transformer ratio:
CTR1
=
CTR2 =
CTR3 =
Connection compensation:
W1CTC =
W2CTC
=
W3CTC=
Nominal line-to-line
voltage (kV):
VWDG1 =
VWDG2=
VWDG3=
Tap calculation:
TAP1
=
TAP2 =
TAP3 =
Differential Settings
O87P =
SLP1 =
SLP2 =
IRS1 =
U87P =
Metered Load (Data taken from substation panel meters, not the SEL-387E Relay)
± Readings from meters
Winding 1
Winding 2
Winding 3
Megawatts: MW1
=
MW2
=
MW3
=
Megavars: MVAR1
=
MVAR2=
MVAR3
=
MVA calculation:
2
2
MVARn
MWn
MVAn
+
=
MVA1=
MVA2=
MVA3=
Calculated Relay Load
Winding 1
Winding 2
Winding 3
Primary Amperes calculation:
VWDGn
3
1000
MVAn
Inpri
¼
¼
=
I1pri =
I2pri =
I3pri =
Secondary Amperes calculation:
CTRn
Inpri
sec
In
,
Y
WnCT
=
=
CTRn
3
Inpri
sec
In
,
D
WnCT
¼
=
=
I1sec =
I2sec =
I3sec =