8-14
Breaker Monitor and Metering Functions
Date Code 20010625
SEL-311L Instruction Manual
Figure 8.8: Input IN106 Connected to Trip Bus for Breaker Monitor Initiation
If the SEL
OGIC
control equation breaker monitor initiation setting is set:
BKMON = IN106
then the SEL-311L Relay breaker monitor sees all trips.
If output contact OUT201 asserts, energizing the trip bus, the breaker monitor will deem it a
relay-initiated trip. This is because when BKMON is newly asserted (input IN106 energized),
the TRIP Relay Word bit is asserted. Thus, the current and trip count information is
accumulated under relay-initiated trips (Rly Trips). If EHST = N, placing TRIP87 in the TR
equation assures a differential trip is counted as a relay-initiated trip.
If the control switch trip (or some other external trip) asserts, energizing the trip bus, the breaker
monitor will deem it an externally initiated trip. This is because when BKMON is newly
asserted (input IN106 energized), the TRIP Relay Word bit is deasserted. Thus, the current and
trip count information is accumulated under externally initiated trips (Ext Trips).
Summary of Contents for SEL-311L
Page 6: ......
Page 8: ......
Page 26: ......
Page 54: ......
Page 144: ......
Page 216: ......
Page 252: ......
Page 302: ......
Page 338: ......
Page 480: ......
Page 484: ......
Page 486: ......
Page 502: ......
Page 532: ...12 28 Standard Event Reports and SER Date Code 20010625 SEL 311L Instruction Manual 4 ...
Page 552: ......
Page 554: ......
Page 574: ......
Page 576: ......
Page 596: ......
Page 602: ......
Page 628: ......
Page 656: ......
Page 662: ......
Page 664: ......
Page 688: ......
Page 700: ......
Page 716: ......
Page 722: ......
Page 734: ......