![SCHUNK VERO-S NST3 400-250 Assembly And Operating Manual Download Page 27](http://html1.mh-extra.com/html/schunk/vero-s-nst3-400-250/vero-s-nst3-400-250_assembly-and-operating-manual_1215848027.webp)
Assembly
Tombstone with zero point change
interface (tombstone and clamping pin
accessories)
Tombstone
4.6 Screw tightening torques
Tightening torques for mounting clamping pins to the workpiece
or to the clamping pallet.
(Screw quality 12.9)
Screw size
M8
M10 M12 M14 M16
Tightening torques (Nm)
32
62
108
170
262
Tightening torque for mounting the clamping station and for
reinstalling clamping modules with fixing screws DIN EN ISO
4762.
The clamping station must be fastened to the machine table with
fastening screws of strength class 10.9. These fixing screws and
any nuts required for the T-slots are not included in the scope of
delivery.
27
02.00 | NST3 | VERO-S quick-change pallet system | en | 1344366
Summary of Contents for VERO-S NST3 400-250
Page 43: ......