Assembly
No
.
Designation
1
Unlocking connection <-- -->
2
Turbo connection --> <--
3
V4 torque pin
4
Detaching thread M10 x 10
5
Blow-off support, internal
6
Blow-off support, external
7
Mounting hole for M8 / Ø 9 f7 fitting screw
8
Fitting screw
9
Mounting monitoring system AFS3 138
10 Media transfer unit
11 Blow-off support torque pin / media transfer unit
12 Blow-off cone
13 Slide monitoring open
14 Slide monitoring closed
Alternative connection option:
Side G1/8" connections which are free when the lower centering
diameter Ø 110 H6 is used. In this case, the bottom openings must
be sealed. To do so, insert the Ø 9 x 1.5 O-rings into the module
and seal the bottom direct connections against the flat bearing
surface.
Four coupling mechanisms for separate media transfer units are
integrated into modules with media transfer units. They are
actuated on the bottom of the module. O-rings are located in the
transfer units for sealing.
5.4 Clamping slide monitoring
Two dynamic pressure monitoring systems are integrated into all
versions of the NSE-A3 138. With these, the respective clamping
slide position effects a build up of pressure in the "OPEN" or in the
"CLAMPED" condition. Either one of the two monitoring functions
can be used or both simultaneously for alternating monitoring.
Actuating clamping slide monitoring requires a reduced pressure
supply that is limited to 2 bar (see chapter "Pneumatic circuit
diagram"
).
The measurable differential pressure must reach a minimum of 1
bar for assessment via the air gap sensor to be reliable. The
maximum pressure is 2 bar. Monitoring requires a pressure
gauge, an adjustable throttle and an air gap sensor.
25
05.00 | NSE-A3 | VERO-S quick-change pallet system | en | 1376941