MAINTENANCE
SRW1000 08/17
Maintenance Section 5-4
© 2017 Alamo Group Inc.
MAINTENANCE
HUBS & SPINDLES
Check hubs weekly for bearing play and condition of seal.
Greasing and Installation
It is recommended that hubs are dismantled, cleaned and repacked every year. Use the diagram and following
instructions for maintaining the wheel hubs. Whenever a worn or damaged seal is replaced the bearing
assembly should be cleaned and repacked with a good grade of wheel grease.
Always wear protective gloves when handling grease.
1. Using a grease packer, pack both roller bearings with a good grade of wheel grease. The bearings should
be thoroughly coated with grease. Spread grease on the outside of the bearing with your gloved finger.
Ensure that no dirt or filings contact the grease or the bearings.
2. Pack the inside of the hub completely with grease.
3. Apply grease on both races.
4. Install the large bearing into the back of the hub and rotate the bearing several times.
5. Install the dust/grease seal using the right size seal driver. Spread a film of grease on the dust seal rubber
and on the axle where the seal fits.
6. Position the hub on the axle and firmly push into place then pull hub towards you about 1". Slowly rotate
hub while gently pushing the hub back onto the axle.
7. Check dust seal to ensure seal rubber is positioned correctly.
8. Install the small or outer bearing.
9. Install the axle washer and castle nut on the axle.
10. Fill dust cap with grease before re-assembling.
Summary of Contents for SRW1000
Page 4: ......
Page 7: ...Safety Section 1 1 2017 Alamo Group Inc SAFETY SECTION ...
Page 19: ...SAFETY SRW1000 08 17 Safety Section 1 13 2017 Alamo Group Inc SAFETY Decal Location ...
Page 21: ...SAFETY SRW1000 08 17 Safety Section 1 15 2017 Alamo Group Inc SAFETY Decal Description ...
Page 22: ...SAFETY SRW1000 08 17 Safety Section 1 16 2017 Alamo Group Inc SAFETY ...
Page 23: ...SAFETY SRW1000 08 17 Safety Section 1 17 2017 Alamo Group Inc SAFETY ...
Page 24: ...SAFETY SRW1000 08 17 Safety Section 1 18 2017 Alamo Group Inc SAFETY ...
Page 25: ...SAFETY SRW1000 08 17 Safety Section 1 19 2017 Alamo Group Inc SAFETY ...
Page 26: ...SAFETY SRW1000 08 17 Safety Section 1 20 2017 Alamo Group Inc SAFETY ...
Page 28: ......
Page 29: ...Introduction Section 2 1 2017 Alamo Group Inc INTRODUCTION SECTION ...
Page 32: ......
Page 33: ...Assembly Section 3 1 2017 Alamo Group Inc ASSEMBLY SECTION ...
Page 45: ...Operation Section 4 1 2017 Alamo Group Inc OPERATION SECTION ...
Page 81: ...Maintenance Section 5 1 2017 Alamo Group Inc MAINTENANCE SECTION ...
Page 90: ......
Page 93: ......